2014年成本管理外文翻译--成本管理中唯一正确的计算方法从作业成本法的角度
《2014年成本管理外文翻译--成本管理中唯一正确的计算方法从作业成本法的角度》由会员分享,可在线阅读,更多相关《2014年成本管理外文翻译--成本管理中唯一正确的计算方法从作业成本法的角度(21页珍藏版)》请在毕设资料网上搜索。
1、4400 英文单词, 2.4 万英文字符 ,中文 7700 字 文献出处: koda M, Slvikov G, Lajin D. The only correct calculation method in cost management: From activity based costing perspectiveJ. Journal of Business and Management, 2014, 3(3): 8-18. The only Correct Calculation Method in Cost Management: From Activity Based Costin
2、g Perspective Miroslav koda, Gabriela Slvikov & Daniel Lajin Abstract In late 1980s National Association of Accountants had introduced Activity-based costing a cost accounting technique which charges organizations indirect costs to the activities that cause the costs to be incurred and then distribu
3、tes costs of activities to the products that cause the activities to be performed. Activity-based costing as a management tool has proved its relevance and found its proponents among academics and managers. Introduction of the time aspect into Activity-based costing proved that it is still attractin
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 年成 管理 外文 翻译 成本 本钱 唯一 独一 仅有 惟一 正确 计算方法 作业 功课 角度
