1、附录 Architecture The summary In order to make people more clear understanding of architecture, this project to backfill earthwork specific requirements and the filled soil compaction, the special problems of the earthwork processing of turkmen excavation and backfilling, should pay attention to the s
2、afety measures for detailed in this paper. Keyword Architecture Earthwork backfilling Concrete Backfilling security Architecture is the art of building. Virtually all architecture be concerned with the en-closure of space for human use. The precise activities to be housed in any specific building, r
3、anging from an assembly Hue in n factory to a living room in a home, should dictate the size and shape of the several areas within, These spaces also must be arranged in some logical rela-tion to each other. Furthermore the movement of human beings within the building requires balls stairs or elevat
4、ors whose size is governed by the expected load of traffic. The plan of a structure, always the first consideration of an architect, is the resolution of these different pur-poses into an organization of spaces that will fulfill the intent of the building, Good planning guides the visitor to his des
5、tination in the structure and impresses him, perhaps subconscious-ly by visibly relating the several units of the edifice. Conversely a bad plan results in incon-venience waste and. visual confusion. Furthermore, a structure must be well built it could have such permanence as the purpose for which i
6、t is intended demands and the materials chosen may allow. The raw materi-als of architecture-stone brick wood steelor glass-in part govern the forms of the building and are expressed by them. Stone can resist compression almost indefinitely. While n is possible 10 crushes stone in a laboratory, for
7、practical purposes its compressive strength is unlimited, On the other hand - stone is weak in withstanding tension. Any beam spanning a void tends to bend downward between the supports, putting the lower half of the beam under tension. It follows from the tensile weakness of stone that beams of thi
8、s material must be comparatively short and supported at frequent intervals. Moreover stone columns must be sturdy rarely more than 10 times as high as they are wide. In stone buildings, windows, doors and the spaces between columns are almost compelled to be Backfill the topic of the Turkish side to
9、 fill specific requirements and the compaction of the earthworks in dealing with the special problems of earth excavation and backfill the attention of the safety measures should be elaborated in detail. Backfilling should ensure that the earthwork fill the strength and stability, such as the design
10、 of a request, should be in conformity with the relevant provisions of the fill material moisture content must also be strictly controlled. By filling the compacted into artificial consolidate and mechanical compaction of the two. Backfill venues should first remove the basement on garbage, grass, r
11、oots, excluding Kengxue in stagnant water, mud and debris, and shall take measures to prevent stagnation of water into the surface filling, soaking the foundation, causing subsidence of soil. By filling the compacted into manual and mechanical compaction consolidating the two, for different construc
12、tion methods have different requirements. A landslide and collapse of the factors (or condition) is very complicated, can be summed up conditions can be divided into internal and external conditions for the two areas, the article on the Turkish side of the landslide and collapse of the prevention an
13、d treatment were discussed and provided a number of specific Programme. Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction. The first phase of the project ,which was conducted at the University of Michigan, involved monotonic punching she
14、ar tests of slabs of fiber-reinforced concreted concrete 60 in.(1520mm) square and 6 in .(150mm) thick .The slabs were constructed with fibers of varying diameters, strengths, and shapes. A 1.5 percent mix of fibers by volume was created for each specimen. Of the fiber tested in the first phase , th