外文翻译——预应力混凝土建筑
《外文翻译——预应力混凝土建筑》由会员分享,可在线阅读,更多相关《外文翻译——预应力混凝土建筑(7页珍藏版)》请在毕设资料网上搜索。
1、 外文资料: Prestressed Concrete Buildings Prestressed concrete has been widely and successfully applied to building construction of all types. Both precast pretensioned members and cast-tensioned structures are extensively employed, sometimes in competition with one another, most effectively in combinat
2、ion wit each other. Prestressed concrete offers great advantages for incorporation in a total building. It is perhaps the “integrative”aspects of these, that is, structure plus other functions, which have made possible the present growth in use of prestressed concrete buildings. These advantages inc
3、lude the following: Structural strength; Structure rigidity; Durability; Mold ability, into desired forms and shapes; Fire resistance; Architectural treatment of surfaces; Sound insulation; Heat insulation; Economy; Availability, through use of local materials and labor to a high degree. Most of the
4、 above are also properties of conventionally reinforced concrete. Presrressing, however, makes the structural system more effective by enabling elimination of the technical of difficulty, e.g., cracks that spoil the architectural treatment. Prestressing greatly enhance the structure efficiency and e
5、conomy permitting longer spans and thinner elements. Above all, it gives to the architect-engineer a freedom for variation and an ability to control behavior under service conditions. Although prestressed concrete construction involves essentially the same consideration and practices as for all stru
6、ctures, a number of special points require emphasis or elaboration. The construction engineer is involved in design only to a limited extent. First, he muse be able to furnish advice to the architect and engineer on what can he done. Because of his specialized knowledge of techniques relating to pre
7、stressed concrete construction, he supplies a very needed service to the architect-engineer. Second, the construction engineer may be made contractually responsible for the working drawings; that is, the layout of tendons, anchorage details, etc. It is particularly important that he gives careful at
8、tention to the mild steel and concrete details to ensure these are compatible with his presressing details. Third, the construction engineer is concerned with temporary stresses, stresses at release, stresses in picking, handling and erection, and temporary condition prior to final completion of the
9、 structure, such as the need of propping for a composite pour. Fourth, although the responsibility for design rests with the design engineer, nevertheless the construction engineer is also vitally concerned that the structure be successful form the point of view of structural integrity and service b
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 预应力 混凝土 建筑
