工程招投标外文翻译--不平衡投标的检测和预防(节选)
《工程招投标外文翻译--不平衡投标的检测和预防(节选)》由会员分享,可在线阅读,更多相关《工程招投标外文翻译--不平衡投标的检测和预防(节选)(8页珍藏版)》请在毕设资料网上搜索。
1、 1 1900 单词, 10200 英文字符, 3150 汉字 出处: Chotibhongs D A R. Detection and prevention of unbalanced bidsJ. Construction Management & Economics, 2009, 27(8):721-732. Detection and prevention of unbalanced bids DAVID ARDITI* and RANON CHOTIBHONGS Unbalanced bidding is a serious problem for the construction
2、owner because it may increase the cost of construction The most common way to mathematically unbalance a bid is frontloading where a bidder overstates the unit price of line items scheduled to be performed early in the project and understates the unit price of line items performed later. A bidder ca
3、n also overstate the unit price of a line item whose quantity was somehow underrated by the engineer. If the owner proves that a mathematically unbalanced bid costs more to perform, the bid is said to be materially unbalanced, in which case the owner can reject the bid. A model is presented that for
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 投标 外文 翻译 不平衡 检测 以及 预防 节选
