建筑外文文献翻译--在项目优先权和成本的基础上对多项目中人力资源配置的研究
《建筑外文文献翻译--在项目优先权和成本的基础上对多项目中人力资源配置的研究》由会员分享,可在线阅读,更多相关《建筑外文文献翻译--在项目优先权和成本的基础上对多项目中人力资源配置的研究(15页珍藏版)》请在毕设资料网上搜索。
1、建筑大学毕业设计外文文献及译文 -1- 中文 3550 字 外文 原文 Study on Human Resource Allocation in Multi-Project Based on the Priority and the Cost of Projects Lin Jingjing , Zhou Guohua SchoolofEconomics and management, Southwest Jiao tong University ,610031 ,China Abstract-This paper put forward the affecting factors of p
2、rojects priority. which is introduced into a multi-objective optimization model for human resource allocation in multi-project environment . The objectives of the model were the minimum cost loss due to the delay of the time limit of the projects and the minimum delay of the project with the highest
3、 priority .Then a Genetic Algorithm to solve the model was introduced. Finally, a numerical example was used to testify the feasibility of the model and the algorithm. Index TermsGenetic Algorithm, Human Resource Allocation, Multi-projects projects priority . 1. INTRODUCTION More and more enterprise
4、s are facing the challenge of multi-project management, which has been the focus among researches on project management. In multi-project environment ,the share are competition of resources such as capital , time and human resources often occur .Therefore , its critical to schedule projects in order
5、 to satisfy the different resource demands and to shorten the projects duration time with resources constrained ,as in 1.For many enterprises ,the human resources are the most precious asset .So enterprises should reasonably and effectively allocate each resource , especially the human resource ,in
6、order to shorten the time and cost of projects and to increase the benefits .Some literatures have discussed the resource allocation problem in multi-project environment with resources constrained. Reference 1 designed an iterative algorithm and proposed a mathematical model of the resource-constrai
7、ned multi-project scheduling .Based 建筑大学毕业设计外文文献及译文 -2- on work breakdown structure (WBS) and Dantzig-Wolfe decomposition method ,a feasible multi-project planning method was illustrated , as in 2 . References 3,4 discussed the resource-constrained project scheduling based on Branch Delimitation met
8、hod .Reference 5 put forward the framework of human resource allocation in multi-project in Long-term ,medium-term and short-term as well as research and development(R&D) environment .Based on GPSS language, simulation model of resources allocation was built to get the projects duration time and res
9、ources distribution, as in 6. Reference 7 solved the engineering projects resources optimization problem using Genetic Algorithms. These literatures reasonably optimized resources allocation in multi-project, but all had the same prerequisite that the projects importance is the same to each other .T