外文翻译---在地铁站施工过程中的风险识别和减轻风险
《外文翻译---在地铁站施工过程中的风险识别和减轻风险》由会员分享,可在线阅读,更多相关《外文翻译---在地铁站施工过程中的风险识别和减轻风险(15页珍藏版)》请在毕设资料网上搜索。
1、附录 Risk identification and risk mitigation During metro station construction by enlarging shield tunnel combined with cut-and-cover method Zhang Xinjin Liu Weining Lu Meili (School of Civil Engineering and Architecture, Beijing Jiao tong University, Beijing100044, China) Abstract: Constructing a met
2、ro station by enlarging shield tunnels combined with a mining /cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process.
3、 Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present including a review of world-wide operational experience of similar projects , the study of generic guidance on hazards associated with the type of work
4、 being under taken ,and discussions with qualified and experienced staff from the project team etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specif
5、ic risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnel sand demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement
6、and a comprehensive risk assessment of the new-style construction method. Key words: shield tunnel; cut-and-cover method; metro station; risk identification; risk mitigation In recent few years, the shield tunneling method has been widely applied in the running tunnel construction of Beijing metro b
7、ecause of its advantages such as quickness, safety and little influence on the surrounding environment etc. But only running tunnel is constructed by the shield tunneling method, and the station is still constructed by the traditional cut-and-cover method or mining method at present. The contradicti
8、on of construction time limit of shield tunnel and the stations has not been well solved. Based on the investigation of domestic and international information, and combined with domestic level of technology and economy, a new solution for the problem is put forward. By the new solution, shield machi
9、ne passes a series of the stations in the line first, then the metro stations are constructed by the cut-and-cover method or the mining method in the proper time, most of the segments are remained, but only a passage is opened at the segments to provide the condition of climbing aboard and getting o