欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    外文翻译---在地铁站施工过程中的风险识别和减轻风险

    • 资源ID:129311       资源大小:1.71MB        全文页数:15页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译---在地铁站施工过程中的风险识别和减轻风险

    1、附录 Risk identification and risk mitigation During metro station construction by enlarging shield tunnel combined with cut-and-cover method Zhang Xinjin Liu Weining Lu Meili (School of Civil Engineering and Architecture, Beijing Jiao tong University, Beijing100044, China) Abstract: Constructing a met

    2、ro station by enlarging shield tunnels combined with a mining /cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process.

    3、 Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present including a review of world-wide operational experience of similar projects , the study of generic guidance on hazards associated with the type of work

    4、 being under taken ,and discussions with qualified and experienced staff from the project team etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specif

    5、ic risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnel sand demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement

    6、and a comprehensive risk assessment of the new-style construction method. Key words: shield tunnel; cut-and-cover method; metro station; risk identification; risk mitigation In recent few years, the shield tunneling method has been widely applied in the running tunnel construction of Beijing metro b

    7、ecause of its advantages such as quickness, safety and little influence on the surrounding environment etc. But only running tunnel is constructed by the shield tunneling method, and the station is still constructed by the traditional cut-and-cover method or mining method at present. The contradicti

    8、on of construction time limit of shield tunnel and the stations has not been well solved. Based on the investigation of domestic and international information, and combined with domestic level of technology and economy, a new solution for the problem is put forward. By the new solution, shield machi

    9、ne passes a series of the stations in the line first, then the metro stations are constructed by the cut-and-cover method or the mining method in the proper time, most of the segments are remained, but only a passage is opened at the segments to provide the condition of climbing aboard and getting o

    10、ff for passengers. Considering that the construction method has not been used before in China and it would be greatly difficult to enlarge the station by the mining method , authors studied the scheme of constructing metro station by enlarging shield tunnel combined with the cut-and-cover method fir

    11、stly based on the test section of Sanyuanqiao station on Beijing metro line10. As a new-style station construction method, there would be several specific risks during the construction process. In this paper, the risks during the construction process of metro station constructed by enlarging shield

    12、tunnel combined with the cut-and-cover method are identified and relevant risk mitigation measures are put forward. 1 Project Situation Sanyuanqiao station is a transfer stations between line 10 and the airport line, which locates at the green space between Jinshun road and the airport expressway. I

    13、t is an underground double-layer and island-style station. Its length is 160.9m. There are four station passageways, one transfer passage, one secure passage and two air ducts. According to the general project plan of line 10 and the construction environment of Sanyuanqiao station, the station is co

    14、nstructed by general cut-and-cover method after the shield passes the tunnel in the scope of the station, and all shield segments are demolished. In order to explore the way of only part of shield segments are demolished, the starting 18.6m of Sanyuanqiao station on Beijing metro line10 is selected

    15、as the test section. The structure scheme of metro station constructed by enlarging shield tunnel combined with the cut-and-cover method is studied, and only parts of shield segments are demolished. The technology has not been used before and it is at the development and research stage. There are sp

    16、ecific requirements to many aspects including shield segments, construction process, and the treatment of the joints etc. Fig.1 shows the general plan of Sanyuanqiao station and the location of the test section, and Fig.2 shows the arrangement of shield segments. The airport line; Line10; Test secti

    17、on Fig. 1 General plan of Sanyuanqiao station 2 Risk Identification and Risk Mitigation 2.1 Survey of risk research Since Einsteinetal introduced risk analysis to tunnel and underground engineering in the 1970s, certain achievements on the research of risk management have been obtained in overseas,

    18、mainly in Europe countries and America. Comparing with overseas, the research of risk management in tunnel and underground engineering in China started relatively later, but with large scale development of underground space in recent few years, the researches of risk management have got unprecedented concern.


    注意事项

    本文(外文翻译---在地铁站施工过程中的风险识别和减轻风险)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583