1、河北工程大学毕业设计(论文) 1 1 外文翻译Rapid construction of the embankment dam Abstract : In recent decades, the soil core rockfill dam has gradually become the worlds construction of the high dam-one of the mainstream, With the new earth and the huge investments in machinery and construction technology of filling
2、 a higher level, Meanwhile dams in-depth testing, greatly expanding the embankment dam scope of the materials and the use of materials for model for more extensive embankment dam will provide favorable conditions to change the long-standing embankment dam with a long construction period, Filling the
3、 lack of low intensity, and further accelerate the progress of the construction, Filling in ensuring construction quality and safe operation under the premise to explore the rapid construction of embankment dams it is very necessary thing. Key words : embankment dam Rapid construction Construction 1
4、 Overview Also known as the embankment dam dam local materials, the necessary soil in situ stone mining in general, but can also make full use of the excavated material. having to basic requirements, low deformation based on the character, filling construction, and can be divided into RCC-grade. Fil
5、l-rockfill dam, directional blasting rockfill dam, the hydraulic fill dams, hydro-filled dam and masonry dam in different ways. Parabolic which administered rockfill dam no longer, directional blasting rockfill dam late settlement exist, not be planted within the dam prototype observation equipment
6、shortage, which are rarely used, hydraulic fill dams, Fill the water main in a special area of the lower dam height of the small and medium projects, the masonry dam strictly speaking belongs masonry dam category, At present, the extensive use of thin sections and the hierarchical compaction roller
7、compacted embankment dam. 2 The need for rapid construction With the dam construction technology, concrete gravity dam dam the technology continues to improve, while the rubber dam and other new dam-constant use, there is a traditional embankment dam filling a large quantity of a long time to build
8、the shortcomings become extremely prominent, how to fully exploit the technology itself embankment dam low, right foundation adaptability, full use of local materials to the traditional advantages to speed up the construction schedule, as Pa-an important option. Filling in ensuring the quality of co
9、nstruction and safe operation of the rapid construction premise is that the parties are concerned. 2.1 Based on the uncertainty, the need to accelerate the progress of measures 河北工程大学毕业设计(论文) 1 2 With the hydropower development progress in basic bad place to build a large embankment dams, In order t
10、o meet the capacity and infrastructure foundation impervious to the needs, often based on the completion of treatment can only be reclaimed after construction, however, foundation of a more complicated, especially in deep-cover construction projects, infrastructure projects are large, unpredictable
11、factors, often need cutoff Vibroflotation, curtain grouting, grouting consolidation of the foundation for the integrated treatment, handling difficult and complex examination, Based on the number of projects, foundation treatment completion and handover of face time is often more work plan by the ti
12、me lag. Filling started causing delay and the next gate or the completion of water storage often not be adjusted, resulting in an effective filling time, Construction units have had to resort to quick construction of measures will be scheduled according to the contract (or even ahead of) completion
13、of the project. 2.2 Hydro-meteorological, filling intensity of the proposed new standards Embankment dam of the hydro-meteorological factors are extremely sensitive and in the rainy season, soil moisture greatly influenced, directly restricts dam reclamation, construction intensity will be affected;