1、 - I - 外文翻译 Quick fix: replacement of an old wooden bridge in St Petersburg was completed earlier this year. Rising traffic levels and development demands led to an old tramway bridge being rebuilt as a cable-stayed crossing in the Russian city of St Petersburg. The new Lazarevsky Bridge across the
2、Malaya Nevka was opened to traffic earlier this year, replacing an old wooden structure which was built for trams but recently had only been used by pedestrians. The bridge is located in Petrograd district and connects Krestovsky and Petrogradsky Islands along Pionerskaya and Sportivnaya Streets, bo
3、th of which are importanat links for local traffic. When it was built in 1949, the crossing was called the Koltovsky Bridge, after the adjacent Malaya Nevka river embankment. But in 1952, it was renamed to commemorate the legendary Russian admiral Mikhail Lazarev. The embankment and the bridge were
4、redesignated the Admiral Lazarev Embankment and Lazarevsky Bridge respectively. Built to the design of engineer VV Blazhevich, the original bridge had 11 spans, the central one being a single-leaf drawspan. It was originally designed for trams and was the only tramway bridge in the city at that time
5、. Its total length was 141m and its width was 11m, the deck consisting of metal baulks and wooden plank flooring. The timber post piers rested on piled foundations of steel pipes. But in 2002 the tramway was closed and since then, the bridge has only been used by pedestrians. Its location meant that
6、 Lazarevsky Bridge served the western part of the city-the Petrograd districts including Krestovsky island. All the road traffic to Krestovsky island used the main Krestovsky Bridge which as a consequence was considerably overloaded. Since the Lazarevsky Bridge carried no vehicular traffic it was no
7、t considered part of the road network of the district. But plans to build a new stadium at the Seaside Victory Park on Krestovsky Island just 3km from the bridge site meant that a reliable transport connection to the rest of the city was required. The local authority decided that reconstruction of t
8、he Lazarevsky Bridge was the best way to provide this. The size of new bridge was determined based on the predicted traffic levels, taking into account the prospective development of the district. According to the forecast, the annual II average daily traffic intensity on Lazarevsky Bridge will rise
9、 to 16,000 vehicles per day by 2025. Peak loads occur during major sporting events at the stadium when the bridge will be required to help relieve the area of traffic within one hour. This traffic flow includes 4,500 to 5,000 cars, so even if the Petrovsky Bridge were to be rebuilt, the Lazarevsky B
10、ridge needed two lanes of traffic in both directions in order to do this. Taking into consideration the fact that the timber structures of the bridge had been in use for more than 55 years, if the bridge reconstruction had been restricted to the widening and strengthening of the existing superstruct
11、ure and piers, it would not have ensured the longevity of the fixed bridge and might have led to high operation costs. Another consideration was that the appearance of a multi-span structure with bulky piers would not have fitted into the architectural style that is emerging with construction of mod
12、ern buildings on Krestovsky Island and the adjacent embankments. As a result, the decision was taken to completely demolish the existing bridge and replace it with a new structure on the same alignment. As part of the project, some of Sportivnaya Street on the right bank had to be widened, and impro