外文翻译--从难处理矿石中氰化浸出提取黄金的新工艺
《外文翻译--从难处理矿石中氰化浸出提取黄金的新工艺》由会员分享,可在线阅读,更多相关《外文翻译--从难处理矿石中氰化浸出提取黄金的新工艺(8页珍藏版)》请在毕设资料网上搜索。
1、中文 1700 字,英文 1200 单词 外文文献翻译 题 目: 学院名称: 指导教师: 职 称: 班 级: 学 号: 学生姓名: 二 一 年 月 英文文献翻译 原稿: New Chloride Leaching Process for Gold Extraction from Refractory Ores WS Rapson Abstract: The extraction process of gold and silver from the gold clay ore containing arsenic and manganese was investigated With the
2、conventional technique the leaching rates of gold and silver are 78 23 and 49 02, respectively To eliminate the negative efects of arsenic and manganese on cyanidation and increase the gold and silver leaching rates, a novel catalyst was added The content of the catalyst used in the process was 8 gp
3、er 500 g org sample, the sample size was 60 prn andthe pH value was kept between l0 and 11 Leaching with the catalyst for 3-5 h under certain conditions, the gold leaching rate increased to over 90 and the silver leaching rate increased to 80一 90 Th e catalyst can efectively liberate gold and silver
4、 from the enclosure of arsemc and manganese and the industrial experiment has great significance to the development and utilization ofthe gold clay ore containing arsenic and manganese. 0.Introduction From certain gold ores, known as refractory gold ores, the gold cannot be fully recovered by direct
5、 cyanide leaching. A major cause of this is the occurrence of much of the gold in such ores in highly disseminated form in sulfide, arsenide and sometimes antimonide minerals. Three methods have been developed for treatment of such refractory ores, each of which involves breaking down the sulfide an
6、d arsenide minerals by oxidation before cyanide extraction. In one method, the sulfide and related minerals containing the gold are recovered by flotation, and roasted. The residues (S- and As-free) are then leached with cyanide. In a second, recently developed process, the flotation concentrates ar
7、e aerated in slurry form in a medium containing Sand As-oxidizing microorganisms before being leached with cyanide. In the third method, breakdown of the S- and As-minerals is achieved by oxidative treatment of the concentrate in an au toclave, followed by cyanide leaching. Method 1 is gradually bei
8、ng abandoned because of environmental pollution problems, and new plants in the USA, South Africa, Australia and elsewhere tend to employ Method 2 or Method 3, which produce less severe problems of this type. There are two factors affecting the extraction rate: one is the elements existing in the go
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 从难 处理 矿石 氰化 浸出 提取 黄金 新工艺
