工程造价外文翻译---国际建设工程风险分析
《工程造价外文翻译---国际建设工程风险分析》由会员分享,可在线阅读,更多相关《工程造价外文翻译---国际建设工程风险分析(16页珍藏版)》请在毕设资料网上搜索。
1、中文 5070 字, 3050 单词, 16800 英文字符 出处: Kupakuwana P S. Risk Analysis of an International Construction Project J. Cost Engineering, 2009. 国际建设工程风险分析 Risk Analysis of the International Construction Project 学 院(系): 专 业 : 学 生 姓 名: 学 号: 指 导 教 师: 完 成 日 期: Risk Analysis of the International Construction Projec
2、t By: Paul Stanford Kupakuwana Cost Engineering Vol. 51/No. 9 September 2009 Adstract This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of the Standards Association of Zimbabwe (SAZ). In particular, i
3、t examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZs traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a contractor and architects in preventing and/or mitigating poten
4、tial construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the plaintiff to have brought a negligence claim against both th
5、e contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction projects. It further served to emphasize the point that clie
6、nts are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong. Key words: Arbitration; laims ;construction; contracts; litigation; project and risk The structural de
7、sign of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick & Bath (HLB). The contract was awarded to Central African Building Corporation (CABCO) who was also responsible for the provision of a special
8、ist roof structure using patented “gang nail” roof trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters building without a certificate of occupation. Also, the defects liability period wa
9、s only three months . The roof structure was in place 10 years before partial failure in December 1999. The building insurance coverage did not cover enough, the City of Harare, a government municipality, issued the certificate of occupation 10 years after occupation, and after partial collapse of t
10、he roof . At first the SAZ decided to go to arbitration, but this failed to yield an immediate solution. The SAZ then decided to proceed to litigate in court and to bring a negligence claim against CABCO. The preparation for arbitration was reused for litigation. The SAZs quantified losses stood at
11、approximately $ 6 million in Zimbabwe dollars (US $1.2m) . After all parties had examined the facts and evidence before them, it became clear that there was a great probability that the courts might rule that both the architects and the contractor were liable. It was at this stage that the defendant
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程造价 外文 翻译 国际 建设 工程 风险 分析
