建筑专业外文翻译----国际建设工程风险分析
《建筑专业外文翻译----国际建设工程风险分析》由会员分享,可在线阅读,更多相关《建筑专业外文翻译----国际建设工程风险分析(12页珍藏版)》请在毕设资料网上搜索。
1、外文文献: Risk Analysis of the International Construction Project By: Paul Stanford Kupakuwana Cost Engineering Vol. 51/No. 9 September 2009 ABSTRACT This analysis used a case study methodology to analyse the issues surrounding the partial collapse of the roof of a building housing the headquarters of t
2、he Standards Association of Zimbabwe (SAZ). In particular, it examined the prior roles played by the team of construction professionals. The analysis revealed that the SAZs traditional construction project was generally characterized by high risk. There was a clear indication of the failure of a con
3、tractor and architects in preventing and/or mitigating potential construction problems as alleged by the plaintiff. It was reasonable to conclude that between them the defects should have been detected earlier and rectified in good time before the partial roof failure. It appeared justified for the
4、plaintiff to have brought a negligence claim against both the contractor and the architects. The risk analysis facilitated, through its multi-dimensional approach to a critical examination of a construction problem, the identification of an effective risk management strategy for future construction
5、projects. It further served to emphasize the point that clients are becoming more demanding, more discerning, and less willing to accept risk without recompense. Clients do not want surprise, and are more likely to engage in litigation when things go wrong. KEY WORDS:Arbitration, claims, constructio
6、n, contracts, litigation, project and risk The structural design of the reinforced concrete elements was done by consulting engineers Knight Piesold (KP). Quantity surveying services were provided by Hawkins, Leshnick & Bath (HLB). The contract was awarded to Central African Building Corporation (CA
7、BCO) who was also responsible for the provision of a specialist roof structure using patented “gang nail” roof 外文文献及译文 20100710 - 1 - trusses. The building construction proceeded to completion and was handed over to the owners on Sept. 12, 1991. The SAZ took effective occupation of the headquarters
8、building without a certificate of occupation. Also, the defects liability period was only three months . The roof structure was in place 10 years before partial failure in December 1999. The building insurance coverage did not cover enough, the City of Harare, a government municipality, issued the c
9、ertificate of occupation 10 years after occupation, and after partial collapse of the roof . At first the SAZ decided to go to arbitration, but this failed to yield an immediate solution. The SAZ then decided to proceed to litigate in court and to bring a negligence claim against CABCO. The preparat
10、ion for arbitration was reused for litigation. The SAZs quantified losses stood at approximately $ 6 million in Zimbabwe dollars (US $1.2m) . After all parties had examined the facts and evidence before them, it became clear that there was a great probability that the courts might rule that both the