机械设计专业外文翻译---工艺规程制订与并行工程
《机械设计专业外文翻译---工艺规程制订与并行工程》由会员分享,可在线阅读,更多相关《机械设计专业外文翻译---工艺规程制订与并行工程(16页珍藏版)》请在毕设资料网上搜索。
1、 英文资料及中文翻译 Process Planning and Concurrent Engineering T. Ramayah and Noraini Ismail ABSTRACT The product design is the plan for the product and its components and subassemblies. To convert the product design into a physical entity, a manufacturing plan is needed. The activity of developing such a p
2、lan is called process planning.It is the link between product design and manufacturing.Process planning involves determining the sequence of processing and assembly steps that must be accomplished to make the product. In the present chapter,we examine processing planning and several related topics.
3、Process Planning Process planning involves determining the most appropriate manufacturing and assembly processes and the sequence in which they should be accomplished to produce a given part or product according to specifications set forth in the product design documentation.The scope and variety of
4、 processes that can be planned are generally limited by the available processing equipment and technological capabilities of the company of plant.Parts that cannot be made internally must be purchased from outside vendors. It should be mentioned that the choice of processes is also limited by the de
5、tails of the product design.This is a point we will return to later. Process planning is usually accomplished by manufacturing engineers.The process planner must be familiar with the particular manufacturing processes available in the factory and be able to interpret engineering drawings.Based on th
6、e planners knowledge,skill, and experience,the processing steps are developed in the most logical sequence to make each part.Following is a list of the many decisions and details usually include within the scope of process planning. .Interpretation of design drawings. The part of product design must
7、 be analyzed (materials,dimensions, tolerances,surface finished,etc.) at the start of the process planning procedure. .Process and sequence. The process planner must select which processes are required and their sequence.A brief description of processing steps must be prepared. .Equipment selection.
8、 In general, process planners must develop plans that utilize existing equipment in the plant.Otherwise, the component must be purchased,or an investment must be made in new equipment. .Tools,dies,molds,fixtures,and gages. The process must decide what tooling is required for each processing step.The
9、 actual design and fabrication of these tools is usually delegated to a tool design department and tool room,or an outside vendor specializing in that type of tool is contacted. .Methods analysis. Workplace layout, small tools, hoists for lifting heavy parts,even in some cases hand and body motions
10、must be specified for manual operations.The industrial engineering department is usually responsible for this area. .Work standards. Work measurement techniques are used to set time standards for each operation. .Cutting tools and cutting conditions. These must be specified for machining operations,
11、often with reference to standard handbook recommendations. Process planning for parts For individual parts,the processing sequence is documented on a form called a route sheet. Just as engineering drawings are used to specify the product design,route sheets are used to specify the process plan.They
12、are counterparts, one for product design,the other for manufacturing. A typical processing sequence to fabricate an individual part consists of: (1) a basic process, (2) secondary processes,(3) operations to enhance physical properties,and (4)finishing operations. A basic process determines the star
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 机械设计 专业 外文 翻译 工艺 规程 制订 制定 并行 工程
