1、 PDF外文:http:/ Modelling and transient stability of large wind farms 1. Introduction Denmark has currently about 2300 MW wind power capacity in on-land and few offshore settings, which corresponds to more than 20% of power consumption(in average). Further, construction of two large-scale offsho
2、re wind farms of 150 MW power capacity each has been announced. The first large offshore wind farm in Denmark will be constructed at Homs Rev by the year 2002 in the area of the system operator ELTRA .This will be followed by the first in the area of the Eastern Danish system operator ,ELKRAFT Syste
3、m ,large offshore wind farm at Rodsand by the year 2003. The installed capacity in on-land settings and in combined heat-power units(UHP)will increase as well, whilst the power production and control ability of the conventional power plants with respect to voltage and frequency are reduced . In the
4、years to come ,the power production pattern in the Danish power system will change from the power supply from conventional power plantsas it is known todayto a power supply mix, where about 30-40%of power consumption(in average) is covered by wind power. In other words, the power technology will und
5、ergo changes from a well-known technology built-up about conventional power plants to a partly unknown technologywind power. In the year to come it will be focusing on maintaining power system stability and voltage stability, for example at a short circuit fault, ensuring power supply safety a
6、nd other important tasks as amount of wind power is drastically increasing. This situation makes it necessary to find solutions with respect to maintaining dynamic stability of the power system with large amount of wind power and its reliable operation. These solutions are based on a number of requi
7、rements that are formulated with respect to operation of the large offshore wind farms and the external power system in case of failure events in the external system. The paper contains separate subjects dealing with design of windmills for large offshore applications and their control that shall be
8、 taken into account with respect to improving the short-term voltage stability. 2. system stability requirements In terms of short-term voltage stability, the major goal is the voltage re-establishing 2 after failure events in the power system with large amount of wind power. The transmi
9、ssion system operator is responsible for maintaining power system stability and reliable power supply. As the situation is today, the majority of the Danish windmills on-land are stall wind turbines equipped with conventional induction generators and ac-connected to the power system. In case of a sh
10、ort circuit fault in the power system, those windmills are easily overspeeded and, then, automatically disconnected from the power system and stopped. Such automatic disconnections will be very fast and ordered by the windmill protection system relay settings. When the on-land windmills are automati
11、cally disconnected, there is no dynamic reactive compensation demands related to them, despite their large power capacity. When the voltage is re-established, the on-land windmills will be automatically re-connected to the power system in 10-15 min afterwards and continue their operation, The on-lan