1、 Urban Underground Railroad arch tunnel Construction Technology Group Abstract Project in Guangzhou Metro Line, right-arch construction method of tunnels to explore. Subway Construction in Guangzhou for the first time put forward a double-arch tunnel to single-hole tunnel construction technology, an
2、d a single type of wall and split in the wall structure, comparison and selection of Technology solutions were obtained to meet the structural safety, construction safety and Economic benefits of better Technology solutions for the future design and construction of similar projects to provide refere
3、nce and reference. Keywords: double-arch tunnel group; a single type of wall; construction Technology; split in the wall. As the circuit design requirements subway tunnel, the tunnel structure produces a variety of forms, ranging from cross-section from double-arch and the three-arch tunnel composed
4、 of double-arch tunnel section is commonly used in the connection lines and crossing lines. In this paper, engineering examples, according to tunnel in which geological conditions, duration requirements, raised through the comparison and selection can achieve rapid construction and the purpose of co
5、nstruction cost savings of the best construction programs. 1 Project Overview Guangzhou Metro Line Road station turn-back line of sports for sports Road station after the return line, structure complex, DK3 016.047 037.157 varying cross-section set the double-arch structure, three-arch structure of
6、tunnels. Ranging from cross-arch tunnel excavation span 20.1m, excavation height of 10.076m, cross-vector ratio of 1:0.5, after lining a hole span 5.2m, large holes, after lining span 11.4m, the wall thickness of 1.6 m. Three double-arch tunnel excavation span 19.9m, excavation height of 7.885m, cro
7、ss-vector ratio of 1:0.1. -Arch tunnel section of rock from top to bottom are: artificial fill soil, red - alluvial sand, alluvial - alluvial soil, river and lake facies soil, plastic-like residual soil, hard plastic - a hard-like residual soil, all weathered rock, strong weathering rock, the weathe
8、red layer and the breeze layer. Tunnel through the rock strata are more homogeneous, the intensity high, carrying ability, good stability. Thickness of the tunnel vault covering 15.5 18m, of which grade Wai rock vault thickness 5.6 7.6m. Double-arch tunnel segment groundwater table is 2.28 4.1m, mai
9、nly Quaternary pore water and fissure water. Section 2 dual-arch construction scheme comparison As the double-arch tunnel segment structure more complex, the tunnel cross-section changes in large, complicated construction process, construction was very difficult, the construction cycle is long, so I
10、 chose a good quality and efficient completion of the construction program segment arch tunnel construction is particularly important. Selection of a construction program, the main consideration the following aspects: (1) construction safety and structural safety; (2) construction difficulties; (3)