1、Discussion about the application of the anchor bar on the slope construction Fu Ming Fu , Zhang Tian Abstract: There are some advantages in strengthening slope with the anchor bar, such as low project cost, convenient for construction and so on. It not only meets the requirement of the reliability o
2、f the construction, but also is economic and reasonable for the construction. Key words: anchor bar; slope; strengthening 1. Introduction Anchor technique uses strata geotechnicals shear strength around bolt to deliver structures pulling force or keep strata of the excavation own stability. Due to t
3、he use of the anchor rod, Anchor strata produce compressive zone and have reinforcement effect to strata, can enhance the strength of strata, improve mechanical properties of strata, make structure and stratum together formed a kind of work together complex. Anchor system can effectively sustain ten
4、sion and shear, improve shear strength of the potential sliding surface, so it can effectively prevent slope to produce sliding damage. Fig 1 after excavation of the slope 2. Project profile The length of a slope is about 60m, the most slope height is about 23m,the angle up to 50 75 , a five-layer f
5、rame structure buildings is far from about 1.5 to 4m at its base edge, its foundation is artificial bored pile and its bearing stratum is in weathered phyllite. Due to the strong weathering of rocks, it was chunky, loosely structured, multi-muddy filling. It has residual slope deposits of silty clay
6、 overlying and local folder with a pulpy, low strength. Slope had collapsed at various locations, it is vary dangerous to the building, so we need to reinforce the slope, and we use stone concrete retaining wall and bolt to support it. 3. Bolt retaining and protecting design 3.1 Bolt design ( 1) all
7、 formation of anchor use whole length bond-type, the binder materials are ordinary cement mortar, the mortar strength grade is M30, the anchor length L is 10 meters, the slope height h is 9 meters. Anchoring section length is 5m. ( 2) According to the construction condition and the needs of the proc
8、ess, the layout form of anchor use quincunx, and in order to make the anchoring force in the role of surface rock surface with uniform, the two adjacent line bolts should be staggered arrangement. ( 3) The anchors number according to h 21 h /3.24 per meter to calculation, the anchor length is L, a t
9、olal of 252. The diameter of drilling holes is 90,the number of drill according to (L-0.1)m per hole to calculation, M30 grout number according to average 0.052m3 per hole to calculation. ( 4) The two adjacent rows vertical spacing of anchor take 2.55m, horizontal spacing take 2.55m. The dip angle o