1、附录 C 外文文献 Discussion on the importance of project management in construction organization design Abstract: The construction organization is a construction project and guide the importanttechnical and economic documents. Can regulate the construction workers, machinery, raw materials, environment, te
2、chnology, equipment,construction, installation, management, production and other conflicts, to supervise the construction and control of organizational design in order to ensure scientific and rational project high-quality, low cost, less the completion of energy. Keywords: project management; const
3、ruction organization; design; importance Construction design and project construction is an important document guiding construction, construction enterprises are able to high-quality, high speed, low cost, low consumption of completed building projects to ensure effective measures, but also strength
4、en the management, the importance of improving economic efficiency means, is also properly handle the construction workers, machinery, raw materials, methods, environment and technology and equipment, civil works and installation of collaboration, consumption and supply, management and production an
5、d other kinds of contradictions, scientific and rational, planned and orderly , the equilibrium organization of production and an important guarantee for project construction. With the establishment of socialist market economy, an increasingly competitive construction market, the objective situation
6、 of construction enterprises have become increasingly demanding, not only in technology and equipment, personnel quality, the construction put forward higher requirements of the organizers, and engineering economic management Pre-settlement work in the project is also facing new challenges. Strict c
7、onstruction market situation, some construction companies are not actively taken measures, professional and technical staff is not updated, training, science and technology management level is very backward, with the preparation of construction design review did not attract enough attention, so ther
8、e will be the following common situations: (1) audit is not compiled before the start of construction organization design: not to pursue the construction of floor plans, materials, cluttered, moving out of import of machinery and equipment, unplanned demand for labor, quality, security, construction
9、 without assurance measures, resulting in nest Workers serious waste management lower. (2) whether it is the preparation of construction design professionals: In order to cope with the higher authorities and supervisory agencies, Party member or check the information to the construction workers on b
10、ehalf of the Code construction design, because the data simply do not know right now who is a leading construction management recent arrangements, had casually made up, just go. (3) the preparation of the low level of construction organization design: Some construction units, construction organizati
11、ons do not understand the importance of the construction process, to write about the sub-construction process, draw a floor plan, schedule progress, it regarded construction organization design. (4) to abandon technology economy: a considerable number of construction enterprises in the preparation o
12、f construction organization design, construction organization which only concerned the various sub-project of the technical measures, without considering the sub-project aspects of economic indicators, leading to the completion of settlement disputes about economic loss. Example 1 in a district of N
13、anning City, the life of a dormitory building to be a form of water renovation project, but because the dormitory was built in the eighties, has been twenty years, the owners between buildings without authorization of their own debris occupied the public space of normal channels, resulting in too na
14、rrow passage between two buildings, traffic problems, so the resulting need for manual handling of construction materials to construction sites, construction materials are stated not to enter the venue and request for additional materials secondary transportation fee, Party A will not sign recogniti
15、on, resulting in economic losses. If the construction units in the field before the start of the investigation, carefully review the preparation of construction design and engineering contract be described in the notes, you can reduce unnecessary trouble. Example 2 of a residential building project
16、excavation, construction site is not large, the construction unit construction with construction design, but no earth survey program, no excavation of the slope coefficient of discharge, nor the accumulation of pre-construction earthwork calculation, the original machine in the pit excavation upperc