外文翻译---大型井巷道贯通工程实践
《外文翻译---大型井巷道贯通工程实践》由会员分享,可在线阅读,更多相关《外文翻译---大型井巷道贯通工程实践(10页珍藏版)》请在毕设资料网上搜索。
1、附录 Lane Road, linking large-scale engineering practice Kung Chenpatriotic NavyHigh Court 1 Project Overview 80 during the late 20th century, wrote Hill gold deposit found in the mining area southeast of 27 # pulse, thick veins, not low grade, substantial reserves, so they changed the implementation
2、of the expansion project, two shaft extension to build a new concentrator, production After the production capacity of 150t / d. Cyanide-wide mud - a new zinc concentrator replacement process # pulse wellhead located in the vicinity of 27 to deal with the main ore of the Hang Hau, Hau sunny ore depu
3、ty. Hang the two away from the 685m, sunny Hang ore to the surface by the ZL-30 shovel 5t capacity dump trucks loaded to the concentrator. Change the design of the expansion project, the main shaft 27, # network can balance the hammer for double upgrade to 8-de-sac under the middle, the middle of a
4、high degree of 40m. 8 for the middle elevation of 387m. Enhance the capacity of the main shaft 200t / d. In order to reduce the ore to surface shipping costs and to eliminate unreasonable sunny Hang reverse some of the ore transport, at the same time, surface mining when shipped by the weather distu
5、rbance is planned wells sunny middle extension from 5 to 6 middle and 6 middle elevation of the same design for the 387m. And then select a suitable program through the middle of sunny Hang over 6 ore production, unity to the 27 # main shaft to the surface ore warehouse. This resulted in two shaft e
6、xtension at the same time, and the level of 387m each other through the two wells through large underground works. 2 through the selection and implementation of programs Nature of the works: In 1990, the implementation of plans to change the design of the expansion project, the main shaft 27 # pulse
7、 comprehensive renovation and extension, extension to sunny well. Two output shaft extension 580m, together with the level of 387m through the Transportation Roadway 840m, while its total mine works through more than 1400m. By rock gold mine geological and survey work regulations in the relevant pro
8、visions of, the works are large-scale projects through. Options: 2 shaft in extension, how to achieve the project through to a battle between two options. The first program: sunny shaft extension to 6 middle, 5 # pulse Shihmen see along veins towards the South East prospecting. 27 # clock shaft exte
9、nsion to 8 middle, south and hit marshalling yard and Shihmen 50m, 120m and then south-west vein wearing see 27 1 # clock after the clock change this heading to the northwest. From the ore-forming theory, these two belong to the same network structure with fissures, fracture due to the degree of str
10、ucture and the formation of such factors as time independent of each other and linked to form the two ore bodies. Tunneling along the vein, through the inevitable. Project: 387m roadway through the project design specifications 2 0m 2 5m, large-scale transport of my mine roadway. Upon completion, th
11、e sunny middle of all of the above Hang Hau 6 ore by the middle of Ingate 2 2 2 sunny second shaft extension program works less. July 1991, wearing Shihmen see 5 # clock pulse after the south east will open up and prospecting, to early 1992, prospecting extended nearly 600m, this time the main shaft
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 大型 巷道 贯通 工程 实践
