    外文翻译---大型井巷道贯通工程实践

    • 资源ID:125160       资源大小:27.51KB        全文页数:10页
    • 资源格式: DOCX        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译---大型井巷道贯通工程实践

    1、附录 Lane Road, linking large-scale engineering practice Kung Chenpatriotic NavyHigh Court 1 Project Overview 80 during the late 20th century, wrote Hill gold deposit found in the mining area southeast of 27 # pulse, thick veins, not low grade, substantial reserves, so they changed the implementation

    2、of the expansion project, two shaft extension to build a new concentrator, production After the production capacity of 150t / d. Cyanide-wide mud - a new zinc concentrator replacement process # pulse wellhead located in the vicinity of 27 to deal with the main ore of the Hang Hau, Hau sunny ore depu

    3、ty. Hang the two away from the 685m, sunny Hang ore to the surface by the ZL-30 shovel 5t capacity dump trucks loaded to the concentrator. Change the design of the expansion project, the main shaft 27, # network can balance the hammer for double upgrade to 8-de-sac under the middle, the middle of a

    4、high degree of 40m. 8 for the middle elevation of 387m. Enhance the capacity of the main shaft 200t / d. In order to reduce the ore to surface shipping costs and to eliminate unreasonable sunny Hang reverse some of the ore transport, at the same time, surface mining when shipped by the weather distu

    5、rbance is planned wells sunny middle extension from 5 to 6 middle and 6 middle elevation of the same design for the 387m. And then select a suitable program through the middle of sunny Hang over 6 ore production, unity to the 27 # main shaft to the surface ore warehouse. This resulted in two shaft e

    6、xtension at the same time, and the level of 387m each other through the two wells through large underground works. 2 through the selection and implementation of programs Nature of the works: In 1990, the implementation of plans to change the design of the expansion project, the main shaft 27 # pulse

    7、 comprehensive renovation and extension, extension to sunny well. Two output shaft extension 580m, together with the level of 387m through the Transportation Roadway 840m, while its total mine works through more than 1400m. By rock gold mine geological and survey work regulations in the relevant pro

    8、visions of, the works are large-scale projects through. Options: 2 shaft in extension, how to achieve the project through to a battle between two options. The first program: sunny shaft extension to 6 middle, 5 # pulse Shihmen see along veins towards the South East prospecting. 27 # clock shaft exte

    9、nsion to 8 middle, south and hit marshalling yard and Shihmen 50m, 120m and then south-west vein wearing see 27 1 # clock after the clock change this heading to the northwest. From the ore-forming theory, these two belong to the same network structure with fissures, fracture due to the degree of str

    10、ucture and the formation of such factors as time independent of each other and linked to form the two ore bodies. Tunneling along the vein, through the inevitable. Project: 387m roadway through the project design specifications 2 0m 2 5m, large-scale transport of my mine roadway. Upon completion, th

    11、e sunny middle of all of the above Hang Hau 6 ore by the middle of Ingate 2 2 2 sunny second shaft extension program works less. July 1991, wearing Shihmen see 5 # clock pulse after the south east will open up and prospecting, to early 1992, prospecting extended nearly 600m, this time the main shaft

    12、 27, # network extension just to the middle 8. In order to speed up the pace through to improve the operating conditions of 6 wells from the middle of sunny 5 # pulse prospecting tunnel test 6543 points, with 27 # 8, the middle of the north side of the pulse Ingate 20m direct directional boring, str

    13、aight-through works of about 400m. Program to determine: the advantages of the first program is for the purpose of prospecting, exploration through integration with Health; shortcomings have long distance, multi-turn, driving conditions, even if the link, because of the need to conduct quasi-cutting

    14、 projects such as mining, making it difficult to play a shipment Route task. The second program of the advantages of the short distance through the construction conditions, and the backbone of the transport roadway almost no turn, could significantly reduce the time period, cost savings, the impleme

    15、ntation of the program, by the second. Vertical slide shaft, the use of vibration into the tub drawing machine, the motor vehicle 4t # connections to the main shaft 27 to position the surface ore. In addition to Hang Hau sunny 5 # pulse along the veins of iron ore prospecting in the gold veins with

    16、tunneling, the straight-through works by more than 400 m through the veins of rock are the crystallization of limestone footwall diorite and neutral, hard rock solid, is not entitled conservation, without gushing, but no fault, fault and fracture zone. Drifting through the works of the major organiz

    17、ations of workers from sunny Possession issued by the production plan construction section. Most of them alone the first tunneling project is planned on 28m, that is, to complete a day of rock blasting and Java tasks; but have also organized a few months of the so-called rapid tunneling, that is, fo

    18、ur classes daily, every two In small classes to complete a driving cycle. In this way, the maximum driving speed of each month 84 7m. To drift through the construction in November 1992, Hang Hau sunny east measuring point from 6543 is also driving more than 200 m, underground transport distance and

    19、ventilation, worker efficiency, and therefore decided to Pulse 8 and # 27 on the north side of the middle Ingate relatively boring 27,802 points. The whole project lasted 2 years, survey work in the mines, the general reference measurement unit 243 geological team 5 accuracy of the measurement resul

    20、ts. Sunny spots near well No. 507 and 27 # clock nearly 512 well point the coordinates of its numerical table. 3 through the measurement method Mine large-scale projects through its technology and technology to ensure that the key lies in measuring the work and working methods of measurement accurac

    21、y. As far as I am today how to ensure that mine ore project through the measurement of large-scale work, a brief introduction as follows. Mining area control network profile: I first built mine ore production, measured after the exploration. Mining the basic control plane network 243 by the nuclear

    22、industry group with the Liaoning Provincial Geological Prospecting Bureau of Geophysical Prospecting Brigade in 1989 and completed in 1991. It is based on nine routes, such as state-level Hill and 山尖 control network, such as Beijing University. Mine is located in the meantime. Corresponding surface of the horizontal control network accuracy. I mine for many years through the application of tests that, 243 Geological


    注意事项

    本文(外文翻译---大型井巷道贯通工程实践)为本站会员(泛舟)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583