1、PDF外文:http:/ 6660 字 出处: International journal of rock mechanics and mining sciences, 2005, 42(1): 127-136 英文原文 Exploitation of developed coal mine pillars by shortwall mining a case example A. Kushwaha, G. Banerjee Central Mining Research Institute, Barwa Road, Dhanbad 826001
2、, Jharkhand, India Abstract: The shortwall mining technique is similar to longwall mining but with shorter face lengths, ranging between 40 and 90m, with the aim of controlling the caving nature of the overlying upper strata, the load on support and the overall operation of the supports applied at t
3、he face. Field observations and three-dimensional numerical modelling studies have been conducted for the longwall panel extraction of the Passang seam at Balrampur Mine of SECL to understand the caving behavior of the overlying upper strata. A large area of the Passang seam adjacent to the longwall
4、 panels has already been developed via bord and pillar workings. In this paper, numerical modelling studies have been conducted to assess the cavability of the overlying strata of the Passang seam in the mine over developed bord and pillar workings along with the support requirement at the face and
5、in the advance gallery. The caving nature of the overlying rocks characterized by the main fall is predicted for varying face lengths, strata condition and depths of cover. The support resistance required at the face, the load in the advance gallery and its optimal obliquity were estimated for faste
6、r exploitation of the developed pillars in the Balrampur mine by shortwall mining. Keywords: Exploitation; Shortwall mining; Geo-mining; Obliquity; Block contours; Main fall; Advance gallery 1. Introduction In India, underground coal production is mostly dependent upon the conventional bord an
7、d pillar (room and pillar) method of mining, although the overall output per man shift (OMS) through this method is generally not more than 1 ton in any of the mines 1. Large areas in all the subsidiaries of Coal India Limited and even in Singarani Coal Companies Limited (India) have been developed
8、via bord and pillar workings. There is a need to search for a new method of mining for the faster exploitation of these developed pillars to improve productivity. In this paper, the authors have conducted different numerical modelling studies using Fast Lagrangian Analysis of Continua (FLAC) softwar
9、e, to assess the cavability of the overlying strata of the Passang seam in Balrampur Mine of SECL (India) over developed bord and pillar workings along with support requirements at the face and in the advance gallery. This study is based on eld observations of a longwall panel and laboratory tested
10、data of the overlying roof rocks as the input parameter for the modelling. The caving nature of the overlying rocks characterized by the main fall span is predicted for varying face length, strata condition and depth of cover. Further, optimal obliquity of the face was also estimated for faster and
11、safe exploitation of the developed pillars by shortwall mining to improve the productivity. 2. Shortwall mining Bord and pillar mining will not be a suitable option for developed pillars at higher depth cover in terms of productivity, safety and percentage of recovery. The technology of shortwall mi
12、ning overcomes most of the limitations experienced in operating longwall mining. In the Indian context, a face length of about 90m is economically optimum with a moderately priced shearer and earning per man shift (EMS) as observed in the Indian longwall mining faces 2. Shortwall mining of the devel
13、oped bord and pillar workings would be a good option to overcome the limitations of the conventional bord and pillar method of mining. 3. Status of the Passang seam of Balrampur mine The geo-mining parameters of the proposed area of the Balrampur mine for shortwall mining panel are given below. Thic