土木工程 建筑外文翻译 --基于盾构法的Istanbul地铁施工引起的地面沉降预测
《土木工程 建筑外文翻译 --基于盾构法的Istanbul地铁施工引起的地面沉降预测》由会员分享,可在线阅读,更多相关《土木工程 建筑外文翻译 --基于盾构法的Istanbul地铁施工引起的地面沉降预测(25页珍藏版)》请在毕设资料网上搜索。
1、PDF外文:http:/ 5351 字 出处: Environmental Earth Sciences, 2011, 62(2): 357-365 外文原文 Surface settlement predictions for Istanbul Metro tunnels excavated by EPB-TBM S. G. Ercelebi H. Copur I. Ocak Abstract In this study, short-term surface settlements are predicted for twin tunnels, whi
2、ch are to be excavated in the chainage of 0 ? 850 to 0 ? 900 m between the Esenler and Kirazl stations of the Istanbul Metro line, which is 4 km in length. The total length of the excavation line is 21.2 km between Esenler and Basaksehir. Tunnels are excavated by employing two earth pressure balance
3、 (EPB) tunnel boring machines (TBMs) that have twin tubes of 6.5 m diameter and with 14 m distance from center to center. The TBM in the right tube follows about 100 m behind the other tube. Segmental lining of 1.4 m length is currently employed as the final support. Settlement predictions are perfo
4、rmed with finite element method by using Plaxis finite element program. Excavation, ground support and face support steps in FEM analyses are simulated as applied in the field. Predictions are performed for a typical geological zone, which is considered as critical in terms of surface settlement. Ge
5、ology in the study area is composed of fill, very stiff clay, dense sand, very dense sand and hard clay, respectively, starting from the surface. In addition to finite element modeling, the surface settlements are also predicted by using semi-theoretical (semi-empirical) and analytical methods. The
6、results indicate that the FE model predicts well the short-term surface settlements for a given volume loss value. The results of semi-theoretical and analytical methods are found to be in good agreement with the FE model. The results of predictions are compared and verified by field measurements. I
7、t is suggested that grouting of the excavation void should be performed as fast as possible after excavation of a section as a precaution against surface settlements during excavation. Face pressure of the TBMs should be closely monitored and adjusted for different zones. Keywords Surface settlement
8、 prediction _ Finite element method _ Analytical method _ Semi-theoretical method _ EPB-TBM tunneling _ Istanbul Metro Introduction Increasing demand on infrastructures increases attention to shallow soft ground tunneling methods in urbanized areas. Many surface and sub-surface structures make
9、 underground construction works very delicate due to the influence of ground deformation, which should be definitely limited/controlled to acceptable levels. Independent of the excavation method, the short- and long-term surface and sub-surface ground deformations should be predicted and reme
10、dial precautions against any damage to existing structures planned prior to construction. Tunneling cost substantially increases due to damages to structures resulting from surface settlements, which are above tolerable limits (Bilgin et al. 2009). Basic parameters affecting the ground deforma
11、tions are ground conditions, technical/environmental parameters and tunneling or construction methods (OReilly and New 1982; Arioglu 1992; Karakus and Fowell 2003; Tan and Ranjit 2003; Minguez et al. 2005; Ellis 2005; Suwansawat and Einstein 2006). A thorough study of the ground by site investigatio
12、ns should be performed to find out the physical and mechanical properties of the ground and existence of underground water, as well as deformation characteristics, especially the stiffness. Technical parameters include tunnel depth and geometry, tunnel diameterlinegrade, single or double track lines