工程类专业毕业设计外文翻译--浅谈房屋建筑施工中的质量管理
《工程类专业毕业设计外文翻译--浅谈房屋建筑施工中的质量管理》由会员分享,可在线阅读,更多相关《工程类专业毕业设计外文翻译--浅谈房屋建筑施工中的质量管理(11页珍藏版)》请在毕设资料网上搜索。
1、 1 Building construction quality management Abstract: adhere to the quality first, improve the management level, improve the quality of construction is the key, only to meet the required quality standards and user requirements under the premise of quality, time limit for a project, cost, to meet the
2、 requirements, to provide more high-quality, safe, economical and applicable building products. Based on this, the building construction quality management of. Key words: housing construction building construction quality management 1 strengthen training, selection of construction personnel is layin
3、g the quality control personnel foundation Engineering quality were all participants in the project construction technology management, operating personnel coordination work results, so construction workers is to form the main factor of project quality. To control the engineering quality first is th
4、e training and selection of construction personnel, improving their comprehensive quality. We should improve their quality awareness, according to comprehensive quality regardless of idea construction personnel must establish five concepts: the concept of quality first, pre-control priority idea, ta
5、lk with data concept and social benefit and enterprise benefit and comprehensive benefit idea. The second is the construction of the technical quality of personnel, management, construction personnel should have higher quality planning and management capacity, production personnel should have superb
6、 technical ability, be strict in ones demands of the style of work, strict implementation of quality standards and procedures of the legal concept, service personnel should do good technology and service life, can be with excellent service indirectly to ensure engineering quality. 2 give full play t
7、o QC quality control function According to the anti-seizure combination, prevention first principle is carried out actively tell, help, anti, card scientific examination method, and the construction personnel together, common to the owners of construction process, responsible, quality control person
8、nel, users, the construction personnel to establish new relations of cooperation, quality inspection staff and the construction site operations personnel is 2 consistent, it is to provide users with high quality, satisfaction of building products. But the construction production is busy, to snatch t
9、he project schedule is loosen quality management tendency occurs. This led to check the quality of the project is checked with contradictions between. To give full play to the initiative of the staff to check the quality of the project, it is necessary to establish the authority of the quality inspe
10、ction personnel, it is very necessary and important. 3 following a case analysis gradually quality management, engineering survey: The territory of Hechi a building for the underground layer, on the ground twenty-two, twenty-five buildings, covers an area of 2550.4 square meters, building a total he
11、ight of 79.950 meters, construction area of 4008 square meters underground, on the ground 36855 square meters, balcony area is 1570.1 square meters; the main design reasonable service life is 50 years; building fire grade two, seismic fortification intensity is 7 degrees, frame aseismic grade two; t
12、he ground floor to the ground floor three layer 2-A axis 2-6 axis and 2-17 axis short limb shear wall seismic rating for a class, the rest of shear wall seismic grade two. The project uses the base form of prestressed high-strength concrete pipe pile, structure type for the cast-in-place reinforced
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程 类专业 毕业设计 外文 翻译 浅谈 房屋建筑 施工 中的 质量管理
