1、 二 一 四 届毕业设计 外 文 翻 译 学 院: 工程机械学院 专 业: 工程机械 姓 名: 学 号: 指导教师: 完成时间: 2014 年 3 月 28 日 1 Recommendations for Paving / Points to Note 1.1 Basic Principles Before starting work, the minimum and maximum pave widths should be established and the paver be set up accordingly. The paving sequence should be co-or
2、dinated with the other teams on site in order to assure the supply of material and prevent the hot mix being driven over too soon. The feed vehicles must be organized in such a way as to ensure a continuous supply of mix with as few paver stops as possible. Check with the mixing plant(s) to ensure t
3、hat mix will be supplied as planned. Check serviceability of the road paver (filling levels, electrical and hydraulic functions, etc.). The feed vehicles tarpaulin cover should only be removed just before dumping the hot mix in order to prevent it cooling. The pave speed should be as constant as pos
4、sible. If mix can only be supplied to a limited extent, it is better to continue paving slowly and uniformly than to interrupt the process by paver stops. In the event of prolonged disruptions in the supply of mix and in cool weather, it is advisable to use up the entire mix stored in the paver and
5、then to lift up and clean the screed. The screed can be re-lowered and the work continued when the supply of mix is resumed. The composition and temperature of the mix should be checked regularly. The layer thickness should be checked regularly while paving in order to avoid errors. When using Autom
6、ated Grade and Slope Control, the sensors must be checked to ensure that they are operating correctly. Paving by hand should only be done in exceptional cases, such as on small surfaces or in corners inaccessible to the paver. The rollers used for subsequent compaction must be dimensioned in accorda