1、1 中文 3078 字 Bidding related knowledge and documents comprising the contract 1. Public and private sectors Bidding practices of the public and private sectors of the industry differ tremendously .The term public in this context means that the construction work is financed by public funds in the form
2、of tax dollar or the proceeds from the sale of municipal , state, or federal bonds. Public and private work have different bid rules. Public construction contracts are advertised and let in accordance with the bidding statutes and other legislatively mandated rules of the particular governmental ent
3、ity that is paying for the instruction work .For instance, when the work is financed with federal funds, the laws and regulations promulgated by federal agencies and bodies govern the process of advertising and awarding construction contracts. Similarly, state, county ,and municipal governments have
4、 statutes and regulations that govern when their funds are used to pay for the cost of the work .In addition ,special governmental or quasi-governmental bodies such as sewer or rapid transit districts are often established by special enabling legislation .The enabling legislation usually provides de
5、finitive rules for advertising and awarding the construction contracts required to carry out the mission of the particular special body involved. Unlike public owners , private owners can establish whatever rules that they want. They also can change the rules at will with the result that these rules
6、 are not necessarily observed .Although the public owner has the ability to set particular rules and to change them by issuing an addendum to the bidding documents ,the power is severely regulated .A bid document addendum is a modification to the bidding documents formally issued by the owner to all
7、 holders of bidding documents before bids are received .In the public sector ,there must be a reasonable time period from the issue date of the last addendum issued and the date of the opening to ensure that all bidders have sufficient time to reflect properly the import of the addendum in their bid
8、s .Bidders are required to list on the bid form all addenda received for their bids to be considered responsive .Failure to list addenda may result in the bid being rejected. In the private sector anything can happen , whereas in the public sector the result will usually be that the job will be awar
9、ded to the lowest “responsive” and “responsible” bidder .These terms have important special meanings that will be discussed later in the chapter. 2. Public Bidding Statutes The requirements of the federal, state ,and local bidding statutes and resulting regulations make the outcome of the bidding pr
10、ocess in the public sector very predictable compared to the private sector .The purposes of public bidding statutes are: 1. To protect public funds .In other words , bidding statutes are designed to ensure that the public pays the minimum possible price for construction work determined by open compe
11、titive bidding . 2. To protect and ensure a continuation of the free enterprise system upon which the political and 2 economic structure of the United States is founded. The public bidding statutes are stringently written and enforced to ensure that public sector construction contracting remains hon
12、est .Increasing ,those who violate the rules find themselves subject to both civil and criminal liability .Errant construction companies have been assessed large fines and their owners or officers sent to prison along with corrupt public officials who have been caught ,tried ,and convicted of violat
13、ing the public trust. 3.Bidding Documents The first category ,bidding documents ,normally begins with an advertisement ,originally discussed in Chapter 1.The back section of contemporary industry periodicals ,such as the Engineering News Record ,contains a plethora of bid advertisement identifies th
14、e project for which bids are desired ,the owner ,the time and place of the bid opening ,and instructions to potential bidders on how to obtain a full set of contract documents. The second document in the bidding group is usually the Invitation for Bids (IFB) or, sometimes , a Request for proposal (R
15、FP). The federal government and some other owners use the IFB when bidders must strictly conform to the drawings and specifications and the RFP When bidders may propose variations for the project .Both typically include the following: A description of the contract work The identity of the owner The