1、附录 A Bridge to the Future The Chao PhrayaRiverBridge is designed to accommodate marine traffic. The 500 m main span will provid 50.5 m of vertical clearance, and the two towers will be situated away from the main navigation channel. The final component of Thailands new Outer Bangkok Ring Road, the e
2、ight-lane cable-stayed Chao PhrayaRiverBridge, will not only alleviate Bangkoks notoriously heavy traffic but also contribute a new architectural symbol to the capital city. By Ruchu Hsu, RE. The bridge will carry four lanes of traffic in each direction. The upper portion of each tower will have an
3、enclosed chamber for cable anchors, a 1.5 m square opening at the bottom providing easy access for maintenance and inspection. For the past 20 years, Thailands capital, Bangkok, has been constructing expressways to lleviate traffic congestion. Among the major expressway projects in the capital is th
4、e Outer Bangkok Ring Road, a 170 km long highway encircling the city. The road is nearly complete; only the eastern half of the southern leg-the Southern Outer Bangkok Ring Road, or S-OBRR-remains to be constructed. Scheduled for completion in 2007, the 21 km elevated viaduct will incorporate four m
5、ajor interchanges and a cable-stayed bridge over the Chao PhrayaRiver. With a main span of 500 m and two side spans of 220.5 m, the Chao PhrayaRiverBridge will be the longest in Thailand. In 1996 the Department of Highways retained a joint venture team of consultants to design the S-OBRR. The design
6、 team included Asian Engineering Consultants (AEC), Thai Engineering Consultants (TEC), and Siam General Engineering Consultants, all of Bangkok; Oriental Consultants, of Tokyo; and Parsons Brinckerhoff (PB), of New York City. Once the joint venture was formed, designers began a feasibility study of
7、 the Chao PhrayaRiver crossing and set about determining the most suitable type of crossing. Tunnels and cable-stayed bridges were developed and evaluated. Eventually, however, it became clear that a bridge would be more economical, would not interrupt marine traffic, and would best lend itself to t
8、he highway interchange. In 1999 engineers began to design the S-OBRR. The Chao PhrayaRiverBridge design was led by PB and supported by AEC and TEC. Conceptual and preliminary designs were pre-pared by PBS New York staff, and Thai engineers working in Bangkok with the author completed the subsequent