土木专业外文翻译---关于钢筋混凝土板桥活荷载简化的研究
《土木专业外文翻译---关于钢筋混凝土板桥活荷载简化的研究》由会员分享,可在线阅读,更多相关《土木专业外文翻译---关于钢筋混凝土板桥活荷载简化的研究(13页珍藏版)》请在毕设资料网上搜索。
1、 1 Investigation of AASHTO Live Load Reduction in Reinforced Concrete Slab Bridges F. El Me sk i 1; M. Mabsout 2 ; and K. Tarhini3 Journal of Bridge Engineering.Submitted July 30,2010;accepted Februray 24,2011;posted ahead of print March 2,2011;doi:10.1061/(ASCE)BE.1943-5592.0000237 1PhD Candidate,
2、Dept. of Civil and Environmental Engineering, American Univ. of Beirut; formerly, Project Engineer at Khatib and Alami, Beirut, Lebanon. Email: fme09aub.edu.lb 2Dept. of Civil and Environmental Engineering, American Univ. of Beirut, Lebanon. Email: mouniraub.edu.lb 3Dept. of Civil Engineering, US Co
3、ast Guard Academy, New London, CT 06320 Email: Kassim.M.Tarhiniuscga.edu Abstract: This paper presents the results of a 3D finite element study that investigated the effect of multi-presence factor of load reduction factors used in the AASHTO Bridge Design Specifications. Typical one-span, two-equal
4、-span continuous, simply supported, three- and four-lane reinforced concrete slab highway bridges were selected for this study. AASHTO HS20 design truck loads are first placed transversally in all lanes, positioned side-by-side and close to one edge of the bridge slab; this fully loaded condition se
5、rved as a reference case. Reduced loading patterns are then investigated using 3D FEA, with design loads in two out of three lanes (Reduced 2/3), three out of four lanes (Reduced 3/4), and two out of four lanes (Reduced 2/4). The longitudinal bending moments and deflection results obtained for the F
6、EA reduced and fully loaded bridges are directly compared. Furthermore, a correlation between the reduced load cases and AASHTO reduction factors or multiple presence factors is made for concrete slab bridges. For the three- and four-lane bridge cases, AASHTO Standard Specifications generally correl
7、ate well with or overestimate the FEA reduced maximum moments and edge beam moments by up to 15% and 30%, respectively. This over-estimation is more pronounced in short-span bridges. It is recommended that a reduction factor of 25% be applied only 2 for reinforced concrete slabs with span lengths gr
8、eater than 12 m (40 ft) and a reduction factor of 10% be applied for spans less than 12 m (40 ft). The AASHTO LRFD overestimated the maximum longitudinal moments and edge beam moments by up to 15% and 40%, respectively. This over-estimation by AASHTO LRFD, which is larger for longer spans, is increa
9、sed to 40% and 55% when compared to the FEA results due to reduced moments. This research supports the current AASHTO LRFD multiple-presence factors of 0.85 for three lanes and 0.65 for four lanes in estimating longitudinal bending moments in concrete slab bridges. The FEA results highlight the impo
10、rtance of considering span length in determining the multi-presence factors when designing three-lane or more concrete slab bridges. Thispaper will assist bridge engineers in quantifying the adjustment factors used in analyzing and designing multi-lane reinforced concrete slab bridges. Keywords: Con
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 土木 专业 外文 翻译 关于 钢筋混凝土 板桥 荷载 简化 研究 钻研
