1、 毕业 设计 ( 论文 )外文 文献 翻译 题 目 : 机械手的研究和开发 _ 学 生 姓 名: 学号: 学 部 (系): _机械与电气工程学部 _ 专 业 年 级: 指 导 教 师: 职称或学位: _ _ 1 外文文献翻译(译成中文 1000 字左右): 【 主要阅读文献不少于 5 篇 , 译文后附注 文献信息 ,包括 : 作者、书名(或论文题目)、出 版 社(或刊物名称)、出版时间(或刊号)、页码 。 提供 所译外文资料附件(印刷 类含封面、封底、目录、翻译部分的复印件等,网站类的请附网址及原文 】 Crane Scheduling with Spatial Constraints And
2、rew Lim, Brian Rodrigues, Fei Xiao, and Yi Zhu Abstract In this work, we examine port crane scheduling with spatial and separation constraints. Although common to most port operations, these constraints have not been previously studied. We assume that cranes cannot cross, there is a minimum distance
3、 between cranes and jobs cannot be done simultaneously. The objective is to find a crane-to-job matching which maximizes throughput under these constraints. We provide dynamic programming algorithms, a probabilistic tabu search and a squeaky wheel optimization heuristic for solution. Experiment show
4、 the heuristics perform well compared with optimal solutions obtained by CPLEX for small scale instances where a squeaky wheel optimization with local search approach gives good results within short times. Introduction The Port of Singapore Authority(PSA) is a large port operator located in Singapor
5、e, one of the busiest ports in the world. PSA handles 17.04 million TEUs annually or nine percent of global container traffic in Singapore, the worlds largest transshipment hub. PSA is concerned with maximizing throughput at its port due to limited port size, high cargo transshipment volumes and lim
6、ited physical facilities and equipment. Crane scheduling and work schedules are critical in port management since cranes are at the interface between land and water sections of any port, each with its own traffic lanes, intersections, and vehicle flow control systems. In this multi-channel interface
7、 we are likely to find bottlenecks where cranes and other cargo-handling equipment (forklifts, conveyors etc.) converge. Sabria and Daganzo studied port operations which focused on berthing and cargo-handling systems. In berthing, which is a widely-flow scheduling on land in ports has also been well
8、 studied. Danganzo studied a static crane scheduling case where cranes could move freely from hold to hold and only one crane is allowed to work on one hold at any one time. The 2 objective was to minimize the aggregate cost of delay. In13, container handling is modelled as “work” which cranes perfo