1、220t / h fuel technical and economic analysis of blast furnace gas boiler Abstract: A large steel company in the energy guzzler, the construction of the 220 t / h burning blast furnace gas boiler project technical and economic analysis for enterprise development, on the basis of energy saving and en
2、vironmental protection to achieve coordination and sustainable development provide the basis for decision-making services. Keywords: burning blast furnace gas boiler; economic analysis; energy saving 0 Overview A large steel company in 2005, energy consumption 544 million tons of coal, the comprehen
3、sive energy consumption of 836 tons of steel.3Kgce, tons of steel comparable energy consumption 796. 3Kgce, high Iron and steel industry in 2005 ton of steel 741Kgce of the overall energy consumption per tone of steel than the energy consumption 715Kgce average level. furnace gas emission losses of
4、the company in 2005 was 10.22%. Blast furnace gas emission loss of 143,000 tons of standard coal. (2) of the enterprise in 2005 tons of steel converter gas recovery ratio of 54 m3 and 95 m3 there is a big gap compared with the domestic advanced level. Ton of steel recycled 90 cubic meters of convert
5、er gas, in 2005 the company loss of converter gas 1.77 Billion cubic meters. Enterprises to improve energy efficiency, energy conservation, and plans to build two sets of 220t / h full-burning blast furnace gas temperature and high pressure boilers, and configure a 15MW high back pressure pre-genera
6、tor set. 1 design 1.1 energy-saving and gas balance calculation Corporate pig iron and coke production in 2005 were 6.53 million tons and 300 tons, that is, the hour is high, coke oven gas remains unchanged. In order to reduce the overall energy consumption of tons of steel, converter steel, iron an
7、d steel ratio decreased from 1.08 in 2005, 1.0, converter steel production was 6.5 million tons. Tons of steel converter gas back Yield of 54 cubic meters in 2005 to 90 cubic meters, the recovery of the amount of 585 million cubic meters, 73,100 cubic meters of hours converter gas recovery, more tha
8、n 41,200 cubic meters in 2005 / multi-recycling 38,100 m3 / h. Transfer is to improve the quality of the sinter and blast furnace air temperature, will be more than recovered Ironmaking and sintering of the furnace gas supply system, the replacement of the original use of blast furnace gas. blast fu
9、rnace gas emission in 2005 loss of 10.22%. Should the construction of this work Agenda item, blast furnace gas is basically to hold loose. through the construction of this project, can reduce the thermal power plant of the existing pulverized coal fired boiler steam production, reduce the blast furn