采矿外文翻译---长壁采煤法回采巷道三向交叉点的三维有限元分析
《采矿外文翻译---长壁采煤法回采巷道三向交叉点的三维有限元分析》由会员分享,可在线阅读,更多相关《采矿外文翻译---长壁采煤法回采巷道三向交叉点的三维有限元分析(28页珍藏版)》请在毕设资料网上搜索。
1、PDF英文:http:/ Finite element analysis of three-way roadway junctions inlongwall mining R.N. Singh, I. Porter, J. Hematian Faculty of Engineering, Uniersity of Wollongong, Northfields Avenue, Wollongong, NSW 2522, Australia Abstract: This paper presents a three-dimensional finite element analysi
2、s ofthree-way roadway intersections in longwall mining,and assesses the stable/unstable behaviour of three-way intersections under a range of loading conditions. Loads wereapplied to the model by means of uniform stresses on the internal free faces. This method of loading the model from theinside he
3、lped to reduce its size and to eliminate the boundary effects. Stress concentrations and displacement results on themid-height of the pillars, roof and floor strata adjacent to the three-way intersections and cut-throughs were calculated.Based on this study, guidelines for designing the support syst
4、em for three-way intersections are suggested. The results werevalidated by a case study of a three-way intersection in an underground coal mine in the southern coal fields of the SydneyBasin. Keywords:underground coal mining; gate roadway; intersections; stability; finite element method 1. Int
5、roduction A trend exists in Australia for installing highproductivity longwall faces producing 3.04.0 milliontonne raw coal per annum per face. The mainconcern for the success of the high-production longwallfaces is to achieve high rates of developmentand to maintain stability of access roadways and
6、their intersections during the life span of the face.Intersections are formed when the pillars betweenthe two roadways are intersected by driving a crosscut. Roadway intersections in underground mines areparticularly susceptible to ground control problemsdue to inherently wide roof spans used and th
7、e difficulty in installing roof supports promptly inhighly mechanised headings. Stresses induced duringintersection formation may result in high incidenceof roof and rib failures. Despite many investigationsinto the stability of gate roadways intersectionsadverse conditionssuch as high horizontal st
8、ress and unsteady state ofabutment pressure from moving longwall faces maycause instability of gate roadway intersections.Forexample in 1985; major strata control problems inthe main gate of no. 6 longwall panel at WestcliffColliery resulted in roof fall, which stopped coalproduction for a period of
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 采矿 外文 翻译 采煤 回采 巷道 交叉点 三维 有限元分析
