外文翻译--公路工程变更原因分析及其对工程造价的影响
《外文翻译--公路工程变更原因分析及其对工程造价的影响》由会员分享,可在线阅读,更多相关《外文翻译--公路工程变更原因分析及其对工程造价的影响(5页珍藏版)》请在毕设资料网上搜索。
1、 Highway engineering change reason analysis and cost of the project of influence Abstract: in the implementation stage because of highway engineering design factors, environmental factors, the influence of various engineering changes happened is more common, combining with engineering practice, this
2、 paper discusses the causes and engineering change of project cost. Keywords: engineering change, Reason, Cost Due to the highway project period, long, long line, so broad in construction of various causes by the engineering change is inevitable. Engineering change could lead to increase of construc
3、tion cost or time limit of the owner and the contractor, between the claim will claim and the cost of the project. Owner of change and the causes of the cost And when the owner change engineering bidding of construction conditions of commitment. SanTongYiPing referred to in the preceding paragraph,
4、the engineering tight finish, delay purpose will increase the contractors settlement fee, but little impact on total cost, the owner or project quantity change projects. Increase the project content or quantity, will increase the cost, Project content or cancel or reduce the number will reduce cost,
5、 but may affect the use function of engineering, because the owner with agreements for the existence of incomplete, or in the contract when division, can increase content of missing the contract cost, and the owners requirements, and shorten delivery of finished ahead of the original contract period
6、, invest more in construction unit cost of manpower and material resources, to increase, and improve the design standard requirement owner, beautiful Angle from security requirements of engineering structure change type, elevation, baseline, location, size and strength, make cost increase, and the o
7、wner to change in the construction organization design has approved the construction plan, cost increase, and the owner of the contract with the owner of the materials or equipment supply for the category and quantity, cause cost increase or decrease, and the owner of the contract specifies unreason
8、able, can make the cost is increased The design of change and the causes of the cost The design adopts the new standard, new technology, new technology, to replace the original design of the project, and put to use more favorable for owner reduce project cost, the depth of the design documents, cann
9、ot satisfy the relevant provisions of the relevant design phase of engineering change and requirements, cost increase or decrease, and when designing units in the preliminary design to fully consider the network planning, and in local government and related departments (e.g., environmental protectio
10、n, water conservancy, electricity, gas, communication, navigation, etc.) and the requirements of the project, the main structure change shape and size change etc, make the cost increase, and design personnel errors or omissions caused engineering change. Due to the two SanShen school system to imple
11、ment the change that cost is increased, Unit, uncoordinated cooperation between designers, or the highway facilities with the principal part of the project design, cause sync job change, make cost increase, and the design drawing not timely delivery time delay, provide, construction, make the cost c
12、ompensation shutdown caused by increased. Tthe contractor to change and cause the influence. Cost The contractor is unable to perform the contract or cant completely, the contractor shall take remedial measures proposed change, this kind of change of engineering cost, can increase by contractor burd