板式换热器毕业设计外文翻译
《板式换热器毕业设计外文翻译》由会员分享,可在线阅读,更多相关《板式换热器毕业设计外文翻译(15页珍藏版)》请在毕设资料网上搜索。
1、大 连海洋大学 2012 届毕业设计 外文翻译(英文) DESIGN OF HEAT EXCHANGER FOR HEAT RECOVERY IN CHP SYSTEMS ABSTRACT The objective of this research is to review issues related to the design of heat recovery unit in Combined Heat and Power (CHP) systems. To meet specific needs of CHP systems, configurations can be altered
2、 to affect different factors of the design. Before the design process can begin, product specifications, such as steam or water pressures and temperatures, and equipment, such as absorption chillers and heat exchangers, need to be identified and defined. The Energy Engineering Laboratory of the Mech
3、anical Engineering Department of the University of Louisiana at Lafayette and the Louisiana Industrial Assessment Center has been donated an 800kW diesel turbine and a 100 ton absorption chiller from industries. This equipment needs to be integrated with a heat exchanger to work as a Combined Heat a
4、nd Power system for the University which will supplement the chilled water supply and electricity. The design constraints of the heat recovery unit are the specifications of the turbine and the chiller which cannot be altered. INTRODUCTION Combined Heat and Power (CHP), also known as cogeneration, i
5、s a way to generate power and heat simultaneously and use the heat generated in the process for various purposes. While the cogenerated power in mechanical or electrical energy can be either totally consumed in an industrial plant or exported to a utility grid, the recovered heat obtained from the t
6、hermal energy in exhaust streams of power generating equipment is used to operate equipment such as absorption chillers, desiccant dehumidifiers, or heat recovery equipment for producing steam or hot water or for space and/or process cooling, heating, or controlling humidity. Based on the equipment
7、used, CHP is also known by other acronyms such as CHPB (Cooling Heating and Power for Buildings), CCHP (Combined Cooling Heating and Power), BCHP (Building Cooling Heating and Power) and IES (Integrated Energy Systems). CHP systems are much more efficient than producing electric and thermal power se
8、parately. According to the Commercial Buildings Energy Consumption Survey, 1995 14, there were 4.6 million commercial buildings in the United States. These buildings consumed 5.3 quads of energy, about half of which was in the form of electricity. Analysis of survey data shows that CHP meets only 3.
9、8% of the total energy needs of the commercial sector. Despite the growing energy needs, the average efficiency of power generation has remained 33% since 1960 and the average overall efficiency of generating heat and electricity using conventional methods is around 47%. And with the increase in pri
10、ces in both electricity and natural gas, the need for setting up more CHP plants remains a pressing issue. CHP is known to reduce fuel costs by about 27% 15 CO released into the atmosphere. The objective of this research is to review issues related to the design of heat recovery unit in Combined Hea
11、t and Power (CHP) systems. To meet specific needs of CHP systems, configurations can be altered to affect different factors of the design. Before the design process can begin, product specifications, 大 连海洋大学 2012 届毕业设计 外文翻译(英文) such as steam or water pressures and temperatures, and equipment, such a
12、s absorption chillers and heat exchangers, need to be identified and defined. The Mechanical Engineering Department and the Industrial Assessment Center at the University of Louisiana Lafayette has been donated an 800kW diesel turbine and a 100 ton absorption chiller from industries. This equipment
13、needs to be integrated to work as a Combined Heat and Power system for the University which will supplement the chilled water supply and electricity. The design constraints of the heat recovery unit are the specifications of the turbine and the chiller which cannot be altered. Integrating equipment
14、to form a CHP system generally does not always present the best solution. In our case study, the absorption chiller is not able to utilize all of the waste heat from the turbine exhaust. This is because the capacity of the chiller is too small as compared to the turbine capacity. However, the need f
15、or extra space conditioning in the buildings considered remains an issue which can be resolved through the use of this CHP system. BACKGROUND LITERATURE The decision of setting up a CHP system involves a huge investment. Before plunging into one, any industry, commercial building or facility owner w
16、eighs it against the option of conventional generation. A dynamic stochastic model has been developed that compares the decision of an irreversible investment in a cogeneration system with that of investing in a conventional heat generation system such as steam boiler combined with the option of pur