1、 On the construction unit how to strengthen the project cost control and management ONE,construction phase of the project investment decision-making According to statistics, in various stages of project construction, the investment decision-making stage of the highest degree of influence of project
2、cost can be achieved by 70% -80%. Therefore, the investment decision-making phase of cost control is to determine the basis of project cost, which directly affects the various construction phases of project cost control is reasonable. 1. Actively carry out preparatory work before the project decisio
3、n-making and seriously to collect relevant information, such as equipment operation, equipment, technical parameters need to be addressed and so on. 2. According to market demand and development prospects, rationally determine the scale of construction and construction standards. 3. Science in the p
4、roject-benefit analysis, preparation of project investment estimates. Investment should be based on estimates prepared, meticulous as far as possible, and seek investment estimation as comprehensive as possible from the reality, take full account of the construction process may occur in a variety of
5、 situations and adverse effects of factors on the project cost, consider the market situation and the construction period reserve price fluctuations factor, so that investment is largely in line with reality, and leave room. To make the investment to play a real control of estimating the total proje
6、ct investment.TWO,construction project design stage Studies have shown that engineering design fees, although it accounted for 3% of construction costs -5%, but the impact of its project cost may exceed 75%. The design phase of the project cost management is the management of the entire project cost
7、 a decisive part. 1. To develop construction project investment objectives of the plan. In theconstruction plans often encounter this situation: in structure, number of storeys, geological conditions are similar cases, the designers used different base and upper part of a larger difference between c
8、oncrete and steel consumption, some of the design safety factor greatly exceed the design specifications, thus causing a lot of investment waste. Thus, with the practical objective of the capital projects planning, so that designers focus on engineering design quality and functionality at the same t
9、ime, will also be project investment as a design control objectives. 2. To carry out activities such as technical and economic analysis, coordination and cooperation to make the design sought to rationalize the design unit. 3. Optimum design to meet the revenue requirement of the capital projects. P
10、reliminary design is complete, the construction unit should organize the relevant experts to design optimization, so that the final design of both the scientific and economical. 4. Vetting budget estimate, suggest improvements. The design phase and construction drawing budget estimates for a full an
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中设计图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 外文 翻译 建设单位 加强 工程造价 控制 节制 管理 方法 法子