外文翻译---变电站电缆自动化系统的有效计划
《外文翻译---变电站电缆自动化系统的有效计划》由会员分享,可在线阅读,更多相关《外文翻译---变电站电缆自动化系统的有效计划(11页珍藏版)》请在毕设资料网上搜索。
1、PDF外文:http:/ Planning of Substation Automation System Cables Thanikesavan Sivanthi and Jan Poland ABB Switzerland Ltd, Corporate Research, Segelhofstrasse 1K, 5405, Baden-Dattwil, Aargau, Switzerland Abstract The manual selection and assignment of appropriate cables to the interconnectio
2、ns between the devices of a substation automation system is a major cost factor in substation automation system design. This paper discusses about the modeling of the substation automation system cable planning as an integer linear optimization problem to generate an efficient cable plan for substat
3、ion automation systems. 1 Introduction Cabling between different devices of a substation automation system (SAS) is a major cost factor in the SAS design process. Usually computer aided design software is used to create the design templates of SAS devices and their interconnections. The design
4、 templates are then instantiated in a SAS project and the cables are manually assigned to the connections. The selection and assignment of cables to connections must follow certain engineering rules. This engineering process is usually time consuming and can cause engineering errors, thereby increas
5、ing the engineering cost. Apparently, the SAS cable planning is related to the well known bin packing problem. The SAS cable planning can be formulated as an integer linear optimization problem with the cable engineering rules expressed as a set of linear constraints and a cost objective for minimiz
6、ing the total cable cost. This paper describes the formulation of SAS cable planning problem as an integer linear optimization problem and presents the results for some representative test cases. To the best of the authors knowledge the work is the first of the kind to study SAS cable planning. The
7、paper is organized as follows. Section 2 presents an overview of the SAS cable planning process. Section 3 expresses the SAS cable planning problem as an integer linear optimization problem. The results obtained by solving the optimization problem using some solvers is presented in Section 4. Sectio
8、n 5 draws some conclusions of this work. 2 SAS Cable Planning The SAS cable planning begins after the system design phase of a SAS project. The SAS cable planning is at present done manually by computer aided design T. Achterberg and J.C. Beck (Eds.): CPAIOR 2011, LNCS 6697, pp. 210214, 2011.c