1、1 ABSTRACT With the development of modern society and economics , environmental issues are coming to our attention more and more . Pollution caused by domestic wastewater is getting worse and well noticed .Sewage treatment is becoming very important and indispensable .This paper is focused on the pr
2、ocess design in our country for domestic wastewater treatment , and select the best process scheme to make the treated water reach the quality that required . This design have adopted the OD process and the procedure is simple ,management is convenient ,do not need to add the first sinking pool , di
3、gestive system ,reducing building and operating expenses , realizing automation totally . At the same time , easy to manage ,making the water reach sewage discharge standard , accomplish the rational utilization of water resource. KEY WORDS: Grid Pumping House OD The Second Sinking Pool Nitrogen and
4、 phosphor removal 1 绪论 1.1 课程设计题目 城市污水处理工艺设计 1.2 设计依据 (1)污水水量 (a) 拟建污水处理规模是平均流量为40000 m 3/d; (b) 城市污水主要包括居民生活污水和工业废水; (c) 城市混合污水变化系数:总变化系数 Kz=1.37。 (2) 进水水质 BOD5=170mg/L;TN=35mg/L; TP=3.8mg/L;总碱度=2000 mg/L。 (3) 出水水质 城市污水经处理后,就近排入厂区附近某河流。污水处理厂出水水质根据GB18918 2002城镇污水处理厂污染物排放标准的一级排放标准(B 标准),污水厂出水水质控 制为:
5、 BOD520mg/L; CODcr60mg/L; SS20mg/L;TN20mg/L; TP1.0mg/l。 2 1.3 处理程度 污水处理程度是由对象和地区排放标准决定。 1.3.1 进出水水质 进出水水质见表 1。 表 1 进出水水质 BOD5(mg/L) TN(mg/L) TP(mg/L) 进水 170 35 3.8 出水 20 20 1.0 1.3.2 去除率 设去除率为E,则有 E= 100 式中: 0 C进水物质浓度; e C出水物质浓度。 (1) BOD5 去除率:E= 100=88.24 (2) TN 去除率: E= 100=42.86 (3) TP 去除率:E= 100=6
6、0.53 2 城市污水处理方案的确定 2.1 确定污水处理方案的原则 (a)城市污水处理应采用先进的技术设备,要求经济合理,安全可靠,出水水质好; 保证良好的出水水质,效益高; (b)污水厂的处理构筑物要求布局合理,建设投资少,占地少;自动化程度高,便于科 学管理,力求达到节能和污水资源化,进行回用水设计; (c)为确保处理效果,采用成熟可靠的工艺流程和处理构筑物;提高自动化程度,为科 学管理创造条件; (d)污水处理采用生物处理,污泥脱水采用机械脱水并设事故干化厂;污水采用季节性 消毒; (e)提高管理水平,保证运转中最佳经济效果;充分利用沼气资源,把沼气作为燃料; (f)查阅相关的资料确定其方案。 0e 0 CC C 17020 170 3520 35 3.81.5 3.8 3 最佳的处理方案要体现以下优点: (a)保证处理效果,运行稳定; (b)基建投资省,耗能低,运行费用低; (c)占地面积小,泥量少,管理方便。 2.2 污水处理方法及工艺流程的的确定 根据测量的水量、水质和环境容量降