    外文翻译--工程索赔相关问题理论

    • 资源ID:126213       资源大小:69KB        全文页数:10页
    • 资源格式: DOC        下载积分:100金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要100金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    外文翻译--工程索赔相关问题理论

    1、石家庄铁道学院四方学院毕业论文 1 附录 A 英文原文 The engineering claims related theory The summary In this paper, the engineering claims related theory must research and engineering claims to the owner and the contractor classification and meaning between the claim to understand. 1.1 The engineering claims and the meani

    2、ng and the claim classification The claim was in the project contract performance of the contract, one party because the other party fails to fulfill the obligations prescribed by the contract suffered losses, to the other party claim behavior. In practice, a claim is a two-way street, the construct

    3、ion unit and the construction units may claim. Usually, claim means the contractor (construction unit) in the implementation of the contract, the causes of non-self engineering extension of time, cost and increase demand for the compensation of losses to the owner a claim. And the owner (the constru

    4、ction units) for the construction unit shall bear the responsibility belongs to cause, and the actual loss happened, ask for compensation to the construction unit, called reverse claim for compensation. The nature of the economic compensation claims belongs to behavior, not punished. In the general

    5、claim can negotiate way through friendly solution, if both sides cant reach a compromise, the dispute by arbitration can solve. Can claim from different angles, and according to the different standards of the following categories: (1)The cause of the classification Such as preparation for constructi

    6、on, process control, quality control and cost control and management of causes of claim for compensation, this classification can explicitly pointed out that each and every one of the source of the claim, make the owner and engineers to audit analysis. (2) The purpose of the claim, according to clas

    7、sification 石家庄铁道学院四方学院毕业论文 2 It can be divided into the time limit and expenses claims claim. Time limit is to ask the owner claims extended construction time, make the original provisions of the project completion date postpone so as to avoid the breach of the fine occurred; Cost is to ask the owne

    8、r and the contractor claim the compensation fees loss and adjust the contract value. (3) According to claim the basis of classification It can be divided into the stipulations in the contract, the contract of the claim. The stipulations in the contract is to point to claim the claim involving conten

    9、t in the documents to find the basis, the owner or the contractor can then put forward the claim. This claim is not so easy to dispute; The contract is the claim to the content of the claim involving in the documents without dedicated word narrative, but can according to the contract terms of some m

    10、eaning, deduced that a certain resulting. (4) According to claim the relevant parties of classification It can be divided into the contractor with the owner of the between claim; The contractor with points between the contractors claim; The contractor with suppliers claims; The contractor to the ins

    11、urance company, shipping companys claim etc. (5) According to the nature of the business claim classification It can be divided into the engineering claims and business claim for compensation. The engineering claims is referred in the construction of the project construction conditions or constructi

    12、on technology, construction scope change claim for compensation, commonly occur high frequency, claim expenses; Business claim is refers to the implementation of the project process materials purchase, transportation, storage, etc of activities create claim matters. (6) According to claim the proces

    13、sing means of classification It can be divided into single claims and always claim for compensation. Single claims about a claim is to take the approach, that is, according to each claim after in the items, and submit them to the notice of a claim, prepare claim for single solve pay, not with other

    14、claims are mixed with the matters; Always claim, and says the comprehensive claims or package claim, that is, the whole project (or a project) that happens in a number of claims matters, comprehensive together for the compensation. 1.2 The owner claims to the contractor 石家庄铁道学院四方学院毕业论文 3 The claim w

    15、as two-sided, generally called claim to the owners claim to the contractors, the claim to the contractors claim to the owner. 1.2.1 Claim reason The contractors default have different situation, sometimes is all or part of the contract, some time is not to execute the contract. For the contractor to

    16、 breach of proof by supervision engineer, the owner according to contract the corresponding provisions of the treatment method of punishment for the contractor. The contractors breach the following kinds roughly include: (1) Not submitted for the performance guarantee; (2) According to the contract

    17、of insurance regulation no; (3) Because of the contractors responsibility delaying; (4) The quality defect, the contractor shall by supervision engineer instruction repair defects at outside, still need to the owner of the quality defects caused loss of responsibility; (5) the contractor to unqualif

    18、ied material doesnt perform supervision engineer instruction to out of the site, and the quality accidents didnt appear to repair or unable to repair, the owner must send someone or hire others to do the above, and pay the expenses should be made by the contractor burden; (6) The contractor that the

    19、 design of the design drawing responsibility; (7) The contractor bankruptcy or serious breach of contract has to terminate a contract; (8) Some other reasons. 1.2.2 Handling claims Appear afore-mentioned incident, general can take the following several methods compensation owner loss: (1) Payable to the contractor from the middle of the progress payment deduct inside.


    注意事项

    本文(外文翻译--工程索赔相关问题理论)为本站会员(译***)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583