欢迎来到毕设资料网! | 帮助中心 毕设资料交流与分享平台
毕设资料网
全部分类
  • 毕业设计>
  • 毕业论文>
  • 外文翻译>
  • 课程设计>
  • 实习报告>
  • 相关资料>
  • ImageVerifierCode 换一换
    首页 毕设资料网 > 资源分类 > DOCX文档下载
    分享到微信 分享到微博 分享到QQ空间

    防洪系统外文翻译

    • 资源ID:149648       资源大小:69.89KB        全文页数:20页
    • 资源格式: DOCX        下载积分:150金币
    快捷下载 游客一键下载
    账号登录下载
    三方登录下载: QQ登录
    下载资源需要150金币
    邮箱/手机:
    温馨提示:
    快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如填写123,账号就是123,密码也是123。
    支付方式: 支付宝   
    验证码:   换一换

     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。

    防洪系统外文翻译

    1、3500 单词, 18500 英文字符 ,5800 汉字 出处: Roman M E, Bender T W. Upper Potomac Industrial Park Flood Control SystemC/World Water & Environmental Resources Congress 2003. 2003: 1-8. 附录一 UPPER POTOMAC INDUSTRIAL PARK FLOOD CONTROL SYSTEM Mary E. Roman, PE 1 and Thomas W. Bender, PE 2 1 McCrone Inc., 20 Ridgely

    2、 Avenue, Annapolis, MD 21401; PH (410) 267-8621;FAX (410) 237-9932; email: mromanmccrone- 2 Allegany County, Department of Public Works, 701 Kelly Road, Suite 300, Cumberland, MD21502; PH (301) 777-5933; FAX (301) 777-2001; email: tbenderallconet.org 1 BACKGROUND During Hurricane Fran, which occurre

    3、d in September 1996, three buildings in the Upper Potomac Industrial Park (UPIP) located near Cumberland in Allegany County, Maryland experienced flooding to depths of approximately eight inches to one foot. The flooding was caused by overtopping of the banks of the North Branch of the Potomac River

    4、 to an approximate elevation of 630.5. This level exceeds the predicted Federal Emergency Management Agencys (FEMAs) 100-year floodplain elevation of 629.2. The flooding caused damages of nearly $500,000 a clothing manufacturer which employs over 500 people. The majority of the damages consisted of

    5、fabrics used to construct clothing. Allegany County was also hit by a major flooding event in January. Both Hurricane Fran and the January flooding event received federal disaster designation. As a result, the Governor of Maryland formed the Western Maryland Flood Mitigation Task Force. The goal of

    6、the task force was to provide immediate and long-range improvements for floodprone areas in western Maryland. The engineering design and construction of improvements at UPIP is one of several projects that Allegany County is proceeding with as part of this task force effort. The challenge presented at UPIP is the fact that the buildings were built higher than the FEMA floodplain to prevent flooding, and yet, Hurricane Fran which was not even at a 100- year event, flood


    注意事项

    本文(防洪系统外文翻译)为本站会员(远***)主动上传,毕设资料网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请联系网站客服QQ:540560583,我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们
    本站所有资料均属于原创者所有,仅提供参考和学习交流之用,请勿用做其他用途,转载必究!如有侵犯您的权利请联系本站,一经查实我们会立即删除相关内容!
    copyright@ 2008-2025 毕设资料网所有
    联系QQ:540560583