1、字数:英文字数:英文 23232323 单词,单词,1327013270 字符;中文字符;中文 40984098 汉字汉字 出 处 :出 处 : Farina L, Danesi E, Travaglini A, et al. Integration of Farina L, Danesi E, Travaglini A, et al. Integration of constructability and project risk managementM/Closing the gap between constructability and project risk managementM
2、/Closing the gap between practice and research in industrial engineering. Springer, Cham, 2018: practice and research in industrial engineering. Springer, Cham, 2018: 313313- -321.321. 外文文献:外文文献: Integration of Constructability and Project Risk Management Abstract The research concerns the EPC world
3、 and Mega-Projects. The focus is on two disciplines: Risk Management and Constructability. An innovative integration model is proposed, aiming to bridge the existing gaps, to support a structured decision-making process and to facilitate the integration of the two disciplines characterised by differ
4、ent approaches and competences, but with a common target: the megaproject success. The validation of the model is carried out by mean of a cost/benefit analysis on four case studies of an EPC contractor (Saipem SpA). Keywords: EPC contractor; Construction Integration; Constructability; Project risk management 1.Introduction Nowadays EPC contractors have to deal with increasingly complex projects, characterized by fragmented and articulated processes. The development of