1、I 摘摘 要要 基于某单位 23 号楼图纸,依据“建设工程工程量清单计价规范(GB50500-2008)” 及“河南省建设工程工程量清单综合单价” ,参考“郑州市 2012 年二月份信息价” ,在 进行手算训练,掌握工程量清单计价基本方法原理的基础上,运用广联达建设工程造价 软件,编制了该工程工程量清单和招标控制价。 通过造价指标的计算,发现该砌体结构工程总造价 922,997.90 元,建筑面积: 877.1542 ,主要材料用量如下:钢筋 23.6138t,木材 9.1588t,砂 254.5649m,石 162.019m,水泥 126.6903t,砖 121.654 千块。 关键词关键词
2、:砌体结构工程;工程量清单编制;招标控制价编制;造价指标分析 河南理工大学河南理工大学本科毕业设计(论文)本科毕业设计(论文) Abstract II Abstract According to the drawings of NO.23 unit,according to “Construction projects bill of quantities specification (GB50500-2008)”and “Henan construction projects bill of quantities unit price”,refer to “Information price
3、 of Zhengzhou City in February 2012”. While during the hand count training,based on the basic principle of the method to master bill of quantities,use GLD construction project cost software,I have prepared the project BOQ and tender control price. Through the calculation of cost index,I have found t
4、hat the total project cost is 922, 997.90. Building Area:877.1542 square meters,the amount of material as follows: reinforced 23.6138t,wood 9.1588t ,sand 254.5649m ,stone 162.019m ,the cement 126.6903t, brick 121.654 one thousand. Keyword : Masonry structure;BOQ establishment; The tender control price of the preparation;Analysis of cost index 河南理工大学河南理工大学本科毕业设计(论文)本科毕业设计(论文) 目目 录录 III 目目 录录 绪绪 论论 1 第一章第一章 工程概况及设计说明工程概况及设计说明 2 1.1 工程概况 2 1.2 编