1、 1 zz 煤焦化发电厂电气部分 学生: 指导老师: 摘 要 发电厂是电力系统的重要组成部分,也直接影响整个 电力系统的安全与运行。在发电厂中,一次接线和二次接 线都是其电气部分的重要组成部分。 设计过程中,综合考虑了经济性、可靠性和可发展性 等多方面因素,在确保可靠性的前提下,力争经济性。设 计说明书中所采用的术语、符号也都完全遵循了现行电力 工业标准中所规定的术语和符号。 在本次设计中,主要针对了一次接线的设计。从主接 线方案的确定到厂用电的设计,从短路电流的计算到电气 设备的选择以及配电装置的布置, 都做了较为详尽的阐述。 Thermal power plant electrical p
2、art Abstract The power plant is an important part of the power system, but also directly affect the safety and operation of the entire power system.In the power plant, the wiring and secondary wiring of the electrical part of the important part of.A more detailed exposition. The design process, comp
3、rehensive consideration of various factors of the economy, reliability and developmental, under the premise of ensuring reliability, and strive to the economy. The terminology used in the design specification, the symbols are in full compliance with the current power industry standards set forth in
4、the terms and symbols. In this design, mainly for a wiring design. From the calculation of short circuit current from the main wiring program to the design of the auxiliary power to the electrical equipment selection and layout of the power distribution unit, have done a more detailed exposition. 2 目目 录录 第一章第一章 电厂电气主接线设计电厂电气主接线设计 1-1 原始资料分析 1-2 主接线方案的拟定 1-3 发电机及变压器的选择 第二章第二章 厂用电设计厂用电设计 2-1 负荷的分类与统计 2-2 厂用电接线的设计 2-3 厂用变压器的选择 第三章第三章 短路电流计算短路电流计算 3-1 概 述 3-2 系统电气设备标