1、 1 设计中英文摘要 本工程结构设计采用框架结构,结构计算按横向框架承重分析。内 力计算考虑以下四种荷载作用,即水平地震荷载作用下的内力,竖向恒 载作用下的内力,重力荷载设计值作用下的内力及风载作用下的内力, 。 在进行截面抗震设计时,柱按偏压构件计算,为保证延性框架要“强剪 弱弯,强柱弱梁,强节点弱构件强锚固的设计原则,且满足构造要求。 Design Abstract This engineering construction design adoption the frame construction, Being calculating the structure, the latera
2、l structure be lacked as frame system and be analysis. construction calculation consider of the action come from four loads, they are horizontal earthquake load, design value of gravity load and representative value of gravity load, and the other is wind load. Being underway the design of cross-sect
3、ion anti-seismic, we look the column as stubbornly pressed member to compute. In the intrest of the assurance of the frame-work ability continue, we adhere to the design principle is “stranger column and weaker beam, stranger shear force and weaker bending, stranger joint stronger anchorage” . And t
4、he cross-section must to meet the demand of construction. 1.1.前言前言 1.1 1.1 工程背景工程背景 2 本项目为 9 层钢筋混凝土框架结构体系,占地面积约为 960.96 m 2, 总建筑面积约为 8811.84 m 2;层高 3.6m,平面尺寸为 18.3m52.0m。采 用桩基础,室内地坪为0.000m,室外内高差 0.6m。 框架梁、柱、楼面、屋面板板均为现浇。 1.1.11.1.1 设计资料设计资料 1.1.1.11.1.1.1 气象资料气象资料 夏季最高气温42.3 C ,冬季室外气温最低9 C 。 冻土深度 25c
5、m,基本风荷载 W。=0.35kN/ m 2;基本雪荷载为 0.2 kN/ m 2。 年降水量 680mm。 1.1.1.2 1.1.1.2 地质条件地质条件 建筑场地地形平坦,地基土成因类型为冰水洪积层。自上而下叙述 如下: 新近沉积层(第一层) ,粉质粘土,厚度0.51.0米,岩性特点, 团粒状大孔结构,欠压密。 粉质粘土层(第二层) ,地质主要岩性为黄褐色分之粘土,硬塑状 态,具有大孔结构,厚度约3.0米, qsk=3540kPa。 粉质粘土层(第三层) ,地质岩性为褐黄色粉质粘土,具微层理, 含铁锰结核,可塑状态,厚度3.5米, qsk=3035kPa。 粉质粘土层(第四层) ,岩性为
6、褐黄色粉质粘土,具微层理,含铁 锰结核,硬塑状态,厚度未揭露,qsk=4060kPa,qpk=15002000kPa。 不考虑地下水。 1.1.1.31.1.1.3 地基土指标地基土指标 自然容重 1.90g/cm 2,液限 25.5,塑性指数 9.1,空隙比 0.683, 计算强度 150kp/m 2。 1.1.1.4 1.1.1.4 地震设防烈度地震设防烈度 7 度 1.1.1.5 1.1.1.5 抗震等级抗震等级 三级 3 1.1.1.6 1.1.1.6 设计地震分组设计地震分组 场地为1类一组Tg(s)=0.25s max 0.16 (表3.8高层建筑结构 ) 1.1.2 1.1.2 材料材料 柱采用 C30,纵筋采用 HRB335,箍筋采用 HPB235,梁采用 C30,纵 筋采用 HRB335,箍筋采用 HPB235。基础采用 C30,纵筋采用 HRB400,箍 筋采用 HPB235。 1.2 1.2 工程特点工程特点 本工程为九层,主体高度为 32.4 米,属高层建筑。 高层建筑采用的结构可分为钢筋混凝土结构