1、 共91页 - 1 - 摘摘 要要 洞门山水利枢纽工程位于位于西南某河干流中下游,是一座 中型水利枢纽工程,其主要任务有发电,灌溉和防洪。该工程主 要由双曲拱坝、泄洪隧洞、取水建筑物以及厂房等组成。本文扼 要介绍设计中进行的主要工作和设计成果: 调洪计算, 枢纽布置, 拱坝坝体设计,坝体应力计算,坝肩稳定分析,泄洪隧洞的设计, 坝身泄水孔的设计,坝体的细部构造以及地基处理等。 设计最后提交的成果有:设计说明书一份,工程设计图纸 3 张以及其他计算附图附表等。 关键关键字字 拱坝,调洪演算,应力分析,稳定分析。 共91页 - 2 - summary DongMen mountain water
2、conservancy hub project is located in the southwest a river mainstream middle and lower reaches, is a medium-sized water conservancy hub project, its main task is power generation, irrigation and flood control. The project mainly by the hyperbolic arch dam, tunnel, water and flood building workshop
3、etc. This paper briefly introduces the main work in the design and the design results: flood regulating calculation, the general layout, arch dam design, dam abutment dam stress calculation, stability analysis of flood discharge tunnel, the design, the design of water leakage, including the influenc
4、es of the detail structure and foundation treatment, etc. The research results have submitted design: the design specification a, the engineering drawings three and other calculation schedule, etc. The appended drawings Key words Arch dam, flood regulating calculation, stress analysis, stability ana
5、lysis. 共91页 - 3 - 目录目录 第一章第一章 工程概况工程概况.(1) 第二章第二章 设计基本资料及水库工程特性设计基本资料及水库工程特性(3 3) 1.1.设计基本资料设计基本资料(3 3) 2.2.水库水位与库容关系及水位流量关系水库水位与库容关系及水位流量关系 (1212) 3.3.效益及淹没损失效益及淹没损失 (1313) 4.4.施工组织设计和建议施工组织设计和建议 (1414) 5 5. .坝址地形图坝址地形图+ +其他其他(1 14 4) 第第三三章章 工程等级划分及水库运行方式工程等级划分及水库运行方式 (1515) 1.1.确定确定工程等别和级别工程等别和级别 (1515) 2.2.水库运用方式水库运用方式 (1515) 第四第四章章 枢纽布置枢纽布置 (1515) 1.1.调洪演算调洪演算 (1515) 1.1.1.1.基本资料的收集基本资料的收集 (1515)