1、摘摘 要要 本毕业设计的对象为一座 1030m 简支梁桥,桥梁平面位于直线段上, 全长 300 米, 宽度 10 米, 设计荷载为公路级。 主梁横向由 5 片 T 梁组成, 梁高均为 1.5m,两片梁之间设置 4cm 宽现浇湿接缝。 本桥采用桩柱式桥墩, 直径 1.5m 的圆形截面墩柱及直径 1.8m 的圆形截面钻孔灌注桩,桩基础嵌 入完整微风化砂岩 5.4m 以下; 采用重力式 U 型桥台,桥台基础为直径 1.5m 的钻孔灌注桩基础。 桥梁上部结构手算进行主梁内力分析。 横向分布系数通过桥梁博士 3.0 计算完成。内力计算结果包括基本组合、长期组合及短期组合作用下的弯 矩图、剪力图、最大应力
2、图。根据内力计算结果,对主梁进行了承载能力 及正常使用性能的验算。盖梁承载能力验算及裂缝宽度验算与抗剪验算、 墩柱承载力验算及裂缝宽度验算、桩基承载力验算及裂缝宽度验算均由自 编计算机程序计算完成,墩柱与桩基的水平位移及其它效应由桥梁博士 3.0 计算完成。 根据验算结果得出结论:设计的桥梁结构是安全、经济、合理的,并 满足现行规范的要求。 关键词:桥梁;荷载组合;内力;验算;承载能力 Abstract The object in this graduation project is a simply supported three-span girder bridge ( 1030m) i.
3、 The bridge is straight on the plane with 300 metres in length and 10 meters in width.The bridge is a part of a highway which the design load is Highway-I-level. The main beam is made up of 5 T-beams that are 1.5m high and the adjacent beams are linked by pouring wet joint with 4cm in width between
4、the two beams. Substructure is made up of circular section piers with a diameter of 1.5 and circular section bored pouring pile foundation with a diameter of 1.8 m, the pilings of foundation are embedded into the intack moderately differentiated rock with a depth of 5.4m. The concrete gravity abutme
5、nt is 6.5m high with a type of U and supported by pile foundation. Analysis of superstructure in the bridge be done by hand. Simply supported single T-beam is used as analysis model in the program, only one edge beam is analysed and the mid beam using the same result in analyzing on safe side. Trans
6、verse distributing coefficient can be exported by using Dr bridge 3.0. The calculations include bending moment diagram, shear force diagram and maximum stress under basic/long-term/short-term load combination. According to the calculations, checking of capacity and performance of normal use of the beam have been done. Checking of capacity/crack width/shear strength of bent cap, capacity /crack width of piers and piles are done by Dr bridge 3.0. According to the calculation results, the bridge