1、 毕业设计(论文)毕业设计(论文) xx 发电公司发电公司电气部分电气部分初步初步设计设计 Electrical part Design in Hunjiang Power Company 1 摘 要 本文主要阐述了 xx 发电公司电气部分设计的全过程 首先,根据设计任务书提供的该厂原始资料和设计规程初步拟定方案,通过 可靠性、灵活性、经济性的比较确定最佳电气主接线方案;接着,根据发电机型 号和厂用电率选择主变压器; 然后, 计算短路电流并选择电气设备 (包括互感器、 断路器、隔离开关等) ;最后,绘制主接线图,平面图,断面图。 关键词 电气主接线 短路电流 断路器 设备选择 配电装置 Abs
2、trct The article main illustrates the Hunjiang Power Company electrical part design in power plant. First of all,according to the task book, the original data and the design regulations, the best main electrical wire connection is made by comparing with the reliability, flexibility and economy. Then
3、, according to the generator capacity and the load rate used by the power plant, the type and capacity of the main transformers are determined. the short-circuit current is calculated to select the main electric equipments(including mutual inductance machine, breakers and switches etc.). Finaly, the
4、 main wiring diagram, floor plans, sections are drawed. Keywords: main electrical wire connection short-circuit electric current breakers equipment selection distribution equipments 目 录 引 言 1 1 电气主接线的确定和厂用电的设计 2 1.1 电气主接线的设计原则 2 1.2 厂用电的设计 5 2 短路电流计算 6 2.1 短路电流计算的目的和方法 6 2.2 原始数据 7 2.3 等值电抗的计算 7 2.4 短路电流的计算过程 8 3 电气设备配置 18 3.1 隔离开关的配置 18 3.2 电压互感器的配置 18 3.3 电流互感器的配置 18 3.4 避雷器的配置 19 3.5 自动装置的配置 19 4 设备的选择与校验 19 4.1 断路器的选择 19 4.2 高压隔离开关的选择 20 4.3 电流互感器的选择 22 4.4 电压互感器的选择 24 4.5 避雷器的选择