1、 毕毕 业业 设设 计论计论 文文 I 摘要摘要 本设计题目为:湖南某县城给水工程初步设计, 按近期最高日设计流量计算,为 (1+5%) 40831.08=42872.634 3 m/d(其中 5%为水厂自用水量)选取 4.5 万吨设计流 量进行计算,要求根据所给资料进行给水工艺设计和单体构筑物设计计算,包括取水 输水构筑物设计、输配水管网设计、净水厂设计、工程概算和制水成本计算。净水厂 采用工艺流程为: 原水一级泵房配水井管式静态混合器栅条絮凝斜管沉淀池V 型滤池清水 池二泵房配水管网至用户 关键词关键词: 湖南某县城;给水工程;取水输水构筑物;净水厂;输配水管网 毕毕 业业 设设 计论计论
2、 文文 II Process Design of Water Treatment Plant in Town Student: HUANG Wei-qiu Teacher:XU Li-wei Abstract:he design entitled : Water Supply project enlarge preliminary design of Hunan a county town ,For calculation, according to the recent high design flow (1 + 5%) = 42872.634 / d 40831.08, (of which
3、 5% for water plant for water) select 45000 tons of design flow rate calculated.according to the given information, technology design and water monomer structure design、and water intake structuresare required. transmission and distribution pipe network design, water purification plant design, engine
4、ering estimates and water costs are also included. Water purification plantsadopts technological is as follows: source of waterLevel of pump roomdistribution wellTube type static mixerGate a flocculation pool and tube settlerV shape filterclean water basinsecondary pump housedistribution systemuser
5、Keywords : Hunan a county town; Water supply engineering; Water intake structures; Waterworks; Water Distribution 毕毕 业业 设设 计论计论 文文 1 目目录录 摘要摘要 I ABSTRACT . II 1 概述概述1 1.1 城市概述 1 1.1.1 概述1 1.1.2 城市概况.2 1.2 工程设计 3 1.2.1 毕业设计题目3 1.2.2 要求提交的设计文件 .3 1.2.3 毕业设计参考资料.4 2 设计水量设计水量 .5 2.1 最高日用水量最高日用水量 5 2.2 最
6、高时用水量 .5 3 管网水力计算管网水力计算 .6 3.1 管网定线 6 3.2 管网水力计算 .7 3.2.1 管网水力计算原则.7 3.2.2 水力计算图 .7 3.3.2 水力计算结果特征参数 7 3.2.3 给水管网校核7 3.3 消防校核 7 3.3.1 消防校核水力计算.8 3.3.2 管网消防校核结果特征参数 .8 3.4 事故校核 8 3.4.1 事故校核水力计算 .8 3.4.2 管网事故校核结果特征参数.9 4 水处理工艺设计水处理工艺设计 .9 毕毕 业业 设设 计论计论 文文 2 4.1 设计原则 9 4.2 给水处理厂规模及流程.10 4.2.1 给水处理厂的设计规模 .10 4.2.2 处理厂工艺流程的选择 .10 4.2.3 水处理工艺的确定11 4.3 药剂选择及投加方式 11 4.3.1 加药间 .11 4.3.2 消毒剂 .14 4.4 水处理构筑物的选择 16 4.4.1 混合设施16 4.4.2 絮凝设施17 4.4.3 沉淀池设施 18 4.4.4 过滤设备20 4.4.5