1、 - 1 - 满堂支架 在预应力现浇箱梁中的应用 Application of the full support of the prestressed cast in place box beam 2012 届届 土木土木 分院分院(系系) 专专 业业 土木工程土木工程 学学 号号 学生姓名学生姓名 指导教师指导教师 完成日期完成日期 2013 年年 9 月月 26 日日 - 2 - 摘 要 以重庆市两江新区龙兴工业园机场东联络线高洞河桥现浇预应力连续箱梁工程 为背景,对连续箱梁支架方案及施工技术进行了介绍,分别阐述了现浇箱梁的施工工 艺、施工方法、施工安全保障措施、以及支架验算、满堂支架搭设
2、及拆除等关键工序 操作要点,以期指导今后同类项目施工。 关键词关键词:现浇箱梁,满堂支架,安全保障 - 3 - Abstract Taking Chongqing Liangjiang New Area Industrial Park Longxing Airport East contact line high hole cast-in-place prestressed continuous box beam bridge as engineering background, the continuous box girder construction technology and met
3、hod are introduced, respectively expounds cast-in-place box beam construction technology, construction method, construction safety and security measures, and support checking, full support the erection and removal of key process operation points, so as to guide the future similar project constructio
4、n. Keywords: Cast-in-situ box girde, full support,security - 1 - 目录目录 摘 要 - 2 - AbstractAbstract - 3 - 一、概述 - 1 - (一)工程概况 - 1 - (二)技术保证条件. - 1 - 1、管理措施 - 1 - 2、组织措施 - 1 - 3、技术措施 - 1 - 二、施工工艺 - 2 - (一)工艺流程 - 2 - (二)施工方案 - 2 - 1、支架施工 - 2 - 2、支架预压 - 5 - 3、模板施工 - 5 - 4、钢筋施工 - 7 - 5、混凝土浇注 - 8 - 6、预应力施工 -
5、 8 - 三、施工安全保障措施 . - 11 - (一)组织保障 - 11 - (二)技术措施 - 11 - 1、一般规定 - 12 - 2、原材要求 - 12 - (三)应急预案 - 13 - 1、应急预案的原则 . - 13 - 2、危险性分析 - 13 - 3、可能发生的事故特征 . - 14 - 4、应急预案工作流程 . - 14 - 5、应急组织机构. - 14 - 6、应急小组成员各岗位职责 - 15 - 7、应急行动程序通则 . - 15 - 8、预防控制措施. - 16 - 四、支架验算计算书 . - 17 - (一)高洞河桥箱梁结构及计算理念 - 17 - - 2 - (二)
6、一般截面箱身支架设计 - 18 - 1、荷载计算 - 18 - 2 、立杆强度验算 . - 18 - (三)梁端截面箱身支架设计 - 19 - 1、荷载计算 - 19 - 2、立杆强度验算. - 19 - 3、横杆稳定验算. - 19 - (四)支架刚度(挠度)验算 - 20 - (五)支架稳定性验算 . - 20 - (六)底模强度计算. - 21 - 1、模板力学性能. - 22 - 2、模板受力计算. - 22 - (七)横梁强度计算. - 23 - 1、方木(落叶松)的力学性能 - 23 - 2、方木受力计算. - 24 - (八)支架抗风荷载计算 . - 25 - - 1 - 满堂支架在预应力现浇箱梁中的应用 一、概述 (一)工程概况 机场东联络线北线东延伸段(以下简称机东北线)位于中日产业园一期用地与民 国一条街二期用地之间,设计道路范围总长约 440.808m,标准路幅宽 38m,双向六 车道,设计等级为城市主干道,计算行车速度 50km/h。 道路于 K0+888 处设置 1x35m预应力混凝土简