1、 - - I 摘要摘要 为了巩固我们所学的知识,并在各方面得到更进一步的提高,我们选择了苏州至无 锡某新建一级公路工程设计作为毕业设计,这是在毕业之前对自身学习状况的最后一次 检查。 我所选择的设计路段是从 K0+000 至 K3+651.654 段,全长 3651.654 米,设计车速 80km/h,路基宽度为 24.5m。 此次毕业设计主要包括的内容如下: 1、路线设计:在已知平面图的情况下,进行纵断面的设计,要求线路顺畅、填挖 平衡、经济合理。 2、路基设计:包括各个桩号的填挖计算、填挖较大地段的稳定分析、整个线路的 土石调运借配等。 3、路基、路面排水工程;高填挖地段的防护工程以及路基
2、加固工程:这一部分相 当重要,对于路基排水,采用了边沟、截水沟、急流槽等排水设施;对于路面 排水,除了对路面进行了路拱设计;对于特殊路段的防护和加固主要采用了骨 架内植草和挡土墙。 4、路面设计:路基在不同干湿状态下,设计沥青路面要求经济合理,便于施工并 满足各设计规范要求。 关键词关键词 路线;路基路面;综合设计 - - II Abstract In order to consolidate our knowledge, and in all respects to be further improved, we chose LiaoNing province a new highway d
3、esign as part of the graduation design, it is before graduation of their learning situation for a final check. In this design, our task is to design an secondary road. The road, which is 3651.654 m from K0+000 to K3+651.654. The design speed is 80km/h and the wide of the subgrade is 24.5m. 1、Route d
4、esign : the known ichnography, longitudinal section design, request line smooth, cut and fill balance, economic and reasonable. 2、The roadbed design: including various pile excavation calculation, cut and fill larger sections of the stability analysis, the whole line of earth-rock allocation by etcT
5、he design of pavement, and this contents that the select of the construction about concrete and asphalt pavement in different case. 3 、 Subgrade, pavement drainage engineering; high cut and fill area protection works and foundation reinforcement engineering: this part is very important, for the drai
6、nage of subgrade, the ditches, drainage ditches, chute, drainage facilities; to pavement drainage, in addition to the pavement of road design; in the special section of the reinforcement and protection by the framework of grass and earth retaining wall. 4 、 avement design: Subgrade under different wet and dry conditions, design of asphalt pavement requirements reasonable economy, convenient construction and meet the design requirement Keywords way roadbed road surface bridge culvert - - I 目录目录