1、1 *水电站重力坝设计水电站重力坝设计 摘要:摘要:*水电站位于新疆阿勒泰地区青河县。该地区地形、地质条件良好,坝基坚硬,故 采用混凝土重力坝设计。主要建筑物由溢流坝段、非溢流坝段、电站厂房等组成。 本篇论文主要完成了由调洪演算确定坝顶高程、重力坝荷载计算、抗滑稳定性分析、消能 放冲设计、 溢流面设计、 大坝细部构造等。 最后确定正常蓄水位 232.2 m, 设计洪水位 233.4 m, 相应下泄流量 5440 m 3/s 相应下泄流量 5950 m3/s、校核洪水位 233.6 m。因由发电要 求,结合当地情况,设置发电厂房为坝后式。 关键字:关键字:调洪演算;混凝土重力坝;荷载计算 Abs
2、tract:Abstract: Leikou Hydropower Station is located in Qinghe County, Altay area, Xinjiang. The area of terrain, good geological conditions, dam foundation hard, so the use of concrete gravity dam design. The main building consists of overflow dam section, non-overflow dam section, power plant plan
3、t and so on. This paper mainly completes the calculation of dam crest elevation, gravity dam load calculation, anti - sliding stability analysis, energy dissipation design, overflow surface design, dam detail structure and so on. Finally, the normal water level is 232.2 m, the corresponding discharg
4、e flow is 5440 m 3 / s, the design flood level is 232.4 m, the corresponding discharge flow is 5950 m 3 / s, and the calibration flood level is 233.6 m. Due to power generation requirements, combined with local conditions, set the power plant for the dam after the type. Key words: Key words: flood c
5、ontrol calculation; concrete gravity dam; load calculation 2 目目 录录 *水电站重力坝设计水电站重力坝设计 1 1 摘要:摘要: 1 1 关键字:关键字: 1 1 KEY WORDS:KEY WORDS: 1 1 目目 录录 2 2 1 水利枢纽基本资料水利枢纽基本资料 4 4 1.1 流域概况 . 4 1.2 枢纽任务 . 4 1.3 坝址地形及地质情况 . 4 2 枢纽布置方案设计枢纽布置方案设计 6 6 2.1坝型选择 6 2.2坝轴线选择 . 6 2.3枢纽建筑工程等级 6 2.4 枢纽布置的原则 7 2.5 枢纽建筑物组成
6、 7 2.6 枢纽布置方案的选择 . 7 2.6.1 建筑物型式的选择. 7 2.6.2 枢纽的布置方案 . 7 3 调洪演算调洪演算 9 9 3.1 调洪计算基本资料 . 9 3.2调洪演算原理 . 12 3.3方案选择: . 12 3.4调洪计算 15 4 非溢流坝段设计非溢流坝段设计 1919 4.1 非溢流坝坝段设计 . 19 4.1.1 坝顶高程的确定 . 19 4.1.2 坝顶宽度. 21 4.1.3 确定重力坝剖面 21 4.1.4荷载及荷载组合. 22 4.2 坝体稳定计算 22 4.2.1 基本资料. 22 4.2.2 稳定计算原理 23 4.2.3 稳定计算. 23 4.2.4 抗滑稳定性分析 28 3 4.3应力分析 29 4.3.1 正常蓄水位情况下: . 30 4.3.2 设计洪水位情况下: . 30 4.3.3 校核洪水位情况下: . 31 5 溢流坝设计溢流坝设计 3232 5.1 泄水方式的选择 32 5.2 溢流堰孔口设计 32 5.2.1 溢流坝段总长度确定 33 5.2.2 堰顶高程的确定 . 33 5.3