1、 第 I 页 设计总说明 施工现场临时用电安全分析及施工组织设计是施工质量和安全的重要保证 和前提,编制的目的在于使施工现场临时用电工程有一个可遵循的科学依据, 从而保障其运行的安全可靠性,另一方面:临时用电组织设计作为临时用电工 程的主要技术资料,有助于加强对临时用电工程的技术管理,从而保障其使用 的安全和可靠性。 本文首先介绍了建筑施工现场临时用电现状,并根据施工现场临时用电 安全技术规范 (JGJ 46-2005)中的规范要求,查阅了建筑电气设计手册 、 工厂供电等相关资料,进而采用需要系数法计算了施工现场临时用电变压 器的容量,及按发热条件对配电线路线径大小的计算,并根据施工现场相关设
2、 备设施的分布情况,确定了合理的布线方式及绘制了临时用电总平面布置图、 系统图、接线图,最后提出了某住宅小区项目施工组织设计方案和临时用电安 全技术措施,以保障整个工程项目安全可靠、快速高效的建设。 关键词:施工现场,临时用电,安全分析,施工组织设计 第 II 页 A residential project temporary electrical safety analysis and construction organization design Design Description Construction site temporary electrical safety analys
3、is and construction organization design is the construction of an important guarantee of quality and safety and premise, the purpose is to make the preparation of the construction site temporary electrical engineering there is a scientific basis to follow in order to protect the safety and reliabili
4、ty of its operation, on the other hand: Temporary electricity organizational design as temporary power projects in the main technical information that helps to strengthen the temporary power engineering technology management, in order to protect the safety and reliability of its use. This paper desc
5、ribes the construction site temporary power status, and according to “the construction site temporary electrical safety technical specifications“ (JGJ 46-2005) in the specification requirements, access to the “Building Electrical Design Manual“, “power plant“ and other relevant data, and then calcul
6、ated using the coefficient method requires construction site temporary power transformer capacity, and according to conditions on the distribution line fever wire size calculations, and related equipment and facilities under construction site distribution, to determine a reasonable manner and wiring temporary power drawn general layout diagram, system diagram, wiring diagram, and finally presents a residential project construction organization design and temporary electrical safety techn