1、昆山市开发区净水厂设计 摘要: 该区总体规划近期人口约为 20 万人,远期有将达 30 万人,年工业产值为 15亿元,远期将达 34亿元。开发区发展方向主要是积极发展区东区并向北、向南适当发展。该区设有纺织、轻工、食品、化工、机械电子、建材、服装、皮革等区、乡、镇属工业、企业近 200家,其中中外、中港合资企业 4 家,新开发 区已 有 11 家企业投产,正在形成一个新型工 区并将成为该区的经济中心。净水厂供水范围主要是解决新开发区的用水。 主要包括取水工程与净水工程,主要内容如下: 1 用水量计算:编制总用水量计算表,确定设计规模( 近、远期); 2 给水系统的选择和给水方案的比较:选择水源
2、与取水方式,确定净水厂厂址和净水工艺,提出可行的给水方案并进行比较; 3 取水工程设计:确定净水厂厂址和净水工艺,提出可行的给水方案并进行方案比较,设计取水构筑物,取水枢纽布置; 4 净水厂设计:净水构筑物的选择与工艺设计,净水厂总体布置(平面及高程) 5泵房设计:确定水泵工况,选择水泵型号及台数,进行泵房工艺布置。 随着该开发区经济的迅速发展,人口的大量增加,工业用水及居民生活用水量大幅度提高,现有的供水量已远远不能满足增长的要求,供需矛盾日益突出,同 时现有的水厂水源地北环城河受到严重污染,水质恶化,所以水厂的建设迫在眉睫,本工程完成之后,可以大大缓解上述矛盾。 关键字: 用水量 工艺设计
3、 方案比较 泵房 管网设计 Kunshan Development Zone water purification plant design Abstract: The overall planning area population of about 20 million people, forward will reach 30 million, the annual industrial output value of 15 billion yuan, forward will reach 34 billion yuan. Development Zone, the main direc
4、tion of development is a positive development area Eastern and north, south proper development. Area of the district is served by the textile, light industry, food, chemicals, machinery and electronics, building materials, clothing, leather, township and town is an industrial, nearly 200 enterprises
5、, including foreign, Hong Kong joint venture of four new development 11 went into operation, and will become the economic center of the area is the formation of a new work area. Water purification plant water supply coverage is mainly water to solve new development zone. The Development Zone is loca
6、ted at latitude 30 23 , longitude 125 57, located in the middle and lower reaches of the alluvial plain. Verge of Taihu Lake, located in the eastern part of Jiangsu Province, Shanghai, east, west, Suzhou, Shanghai-Nanjing Railway and the Trans territory of the river criss-cross, lakes, land and wate
7、r transportation is very convenient, the city is a city with more than two thousand years of history of the southern city. Of the region is broad and flat, ground elevation is generally 1.3-1.9m, local area 2.5-3.0m, the Yufeng elevation up to 80.8m. Water engineering and water purification works, t
8、he main contents are as follows: 1 water consumption: the preparation of the total water consumption table to determine the design size (short and long term); The comparison of the choice of the water supply system and water supply program: Select the water and water to determine the water treatment
9、 plant site and the water purification process, and propose viable water supply programs and compare; Water engineering: to determine the site and the water purification process of water purification plants, and put forward feasible water supply program and program comparison, the layout of the desi
10、gn water intake structures, water diversion project; 4 water treatment plant design: choice of water structure and process design, water purification plant general layout (horizontal and vertical) 5 pumping station design: Make sure the pump working conditions, select the pump type and number of pum
11、ping stations and process layout. With the rapid economic development of the Development Zone, a large number of the population increase, industrial water and household water use will greatly improve the amount of the existing water supply can not meet the increasing demands of the increasingly prom
12、inent contradiction between supply and demand, while the existing water Ring River, north of the plant water source of serious contamination, deterioration of water quality, water treatment plant construction is imminent, after the completion of this project, we can greatly alleviate the above contradictions. Keywords: water consumption design options to compare pumping station pipe network design