1、 不等跨简支板梁桥 摘 要 该桥为苏州某开发区主要干道上的一座桥梁,桥梁跨越河塘,无通航要求。该桥运用所学的理论知识及结合毕业实习的现场实际经验,通过计算及运用计算机应用软件,采用计算机 及手绘 出图。 该工程钢筋混凝土结构的结合形成及各种原材料计算使用对本人有很大的启发,完成一座桥梁的设计必需先进行调查研究,了解设计深度,对不同设计方案的比较,采用可行的经济合理的方案,考虑各种荷载,得出该桥梁的结构可靠度,按照国家设计及施工规范、强制性条文的要求,利用所学知识,在指导教师的 指导 下,根据不同的结构,选择结 构计算单元,进行荷载计算、竖向荷载作用下内力计算、水平荷载作用下的内力和弯矩计算、截
2、面设计、主梁设计、基础设计(采用钻孔桩基础计算配筋),确定截面的配筋还应满足构造要求。施工图中 ,结构及构件尺寸的标注要齐全 ,受力钢筋、箍筋及构造钢筋的编号清楚、正确。受力钢筋的锚固、连接及截断位置清楚正确。通过本次的毕业设计,使我对桥梁工程的形成及起步初始阶段怎样利用所学的知识进行一个综合认识,为今后涉或进入该行业打好良好的基础。 关键词 桥梁, 钢筋混凝土结构 , 内力 , 计算配筋 。 Abstract This bridges for Suzhou some development zone main yang or male principle on bridge, bridge
3、spanning river pond, non-navigation request. This bridge utilization studies the theoretical knowledge and the union graduation fieldworks scene practical experience, through the computation and the utilization computer application software, uses the computer to leave the char This project reinforce
4、d concrete structures union forms and each raw material computation use has the very big inspiration to myself, completes a bridge the design to probably conduct the investigation and study first, understands the designed depth, to the different design proposals comparison, uses the feasible economi
5、cal reasonable plan, considered that each kind of Dutch carries, obtains this bridge structure reliability, according to the national design and the job specification, the compulsory articles request, uses studies the knowledge, in instructs under teachers teaching with skill and patience, according
6、 to the different structure, the choice structure computing element, carries on the load computation, under the vertical load function the endogenic force computation, under the horizontal load functions endogenic force and the bending moment computation, the section design, the king post design, th
7、e foundation design (use drill hole pile foundation computation reinforcing bars), true decides the section the reinforcing bars also to satisfy the structure request. In the construction drawing, the structure and component sizes labelling must be complete, the working reinforcement, the stirrup an
8、d the structural reinforcement serial number is clear, is correct. Working reinforcements anchor, connects and interrupts the position clearly correct. through this time graduation project, will cause me the knowledge which how to use to bridge buildings formation and the start preliminary stage studies to carry on a synthesis understanding, is the present fords or enters this profession to build the good foundation. Keywords: Bridges, reinforced concrete structure, the internal force, the calculation of reinforcement.